BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work and paving for a civil project in Clintonville, Wisconsin. Completed plans call for site work for a development; for paving for a development; road / highway; and road / highway.

As of June 20, 2025. Project was awarded to Northeast Asphalt, but no awarded amount is available. for the following projects: PROJECT 1: Peeters Road improvements from County Road F to approximately 400 yards North of Birch Road In general, the project consists of improving Peeters Road from County Road F to 400 yards North of Birch Road, approximately 4,000 feet of roadway18 feet wide. Project includes milling butt joints, clean and tack, wedging, with 2 inch of overlay. Erosion control, site restoration, and associated work items. Price per ton. Shouldering 2 feet wide, price per ton. PROJECT 2: Taubel Road improvements from County Road I to Peeters Road In general, the project consists of improving Taubel Road from County Road I to Peeters Road, approximately 1 mile of roadway 18 feet wide. Project includes milling butt joints, clean and tack, wedging, with 2 inch of overlay. Erosion control, site restoration, and associated work items. Price per ton. Shouldering 2 feet wide, price per ton.

Award

Roads / Highways

$640,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
32
Bidding Soon
544
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

June 16, 2025

Project location map

Taubel Rd, Clintonville, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.