Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 2, 2025 at 8:00 PM
Updated May 3, 2025
This is a service / maintenance or supply contract in York Landing, Manitoba. Contact the soliciting agency for additional information.
Reference Number 0000292650 Question Acceptance Deadline 2025/05/06 03:00:00 PM CDT Quality Assurance (QA) Services The Thompson Regional Airport is located in the Northern region of Manitoba and is within zones of discontinuous permafrost, which is causing differential substantial settlement of the Air Terminal Building (ATB) and adjacent infrastructure impacting the safety aerodrome operations. The TRAA secured funding from multiple agencies, including the Canada Infrastructure Bank (CIB), Disaster Mitigation and Adaptation Fund (DMAF), and the Province of Manitoba to design and construct a new ATB with accompanying infrastructure southwest of the existing facilities. The airside site works for the project has been funded by Trasport Canada through Airports Capital Assistance (ACAP) program. Avia NG has been requested by the Owner to provide design and construction administration services for the Airport Redevelopment Project. Maple Leaf Construction (MLC) was awarded the project as the General Contractor on July 3, 2024, to perform the construction. Groundside Infrastructure: Asphalt ring road and double terminal curb, including gravel shoulders and/or curb/gutter; Parking lot (asphalt and gravel surfaced) with concrete walkways, plug-in pedestals, lighting, and potential parking gate system; Loading dock outside of new ATB and future tenant lot grading; Gravel hangar road; Stormwater system and connections with supporting culverts and drainage ditch; Supporting electrical works and lighting; Pavement markings; and Airport security fencing in between the new landside and airside infrastructure. Airside Infrastructure: Aircraft parking apron (asphalt); Two taxiways (one gravel, one asphalt) and one provisional taxiway (asphalt); Airfield signage, edge light, pullpit and apron floodlights; Grading future tenants apron; Construction of supporting airfield stormwater system connections with storm outlet and ditches, subdrains, and catchbasins for the new apron and taxiways; Refurbish existing apron concrete panels for fill material and regrade with granular materials; Pavement markings for the new apron and stand, taxiway, and vehicle and pedestrian corridors. Construction Start - June 01, 2025 Substantial Completion (Tentative) - September 30, 2025 Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Conceptual
Transportation Terminals
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2025
1 Airport Rd, York Landing, MB
Related To This Project
York Landing, MB
Bid Date: Jun 14 2024
York Landing, MB
Bid Date: Mar 07 2024
Winnipeg, MB
Bid Date: May 14 2025
San Clara, MB
Bid Date: May 14 2025
Winnipeg, MB
Bid Date: May 23 2025
Winkler, MB
Bid Date: May 14 2025
Winkler, MB
Bid Date: May 08 2025
Winnipeg, MB
Bid Date: May 27 2025
Winnipeg, MB
Bid Date: Jun 09 2025
Brandon, MB
Bid Date: May 09 2025
Killarney, MB
Bid Date: May 16 2025
Southport, MB
Bid Date: May 14 2025
Portage La Prairie, MB
Bid Date: May 29 2025
Manitou, MB
Bid Date: May 22 2025
Hecla, MB
Bid Date: May 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
