BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 14, 2025 at 8:00 PM

Updated August 21, 2025

Site work for a water / sewer project in Bryan, Texas. Completed plans call for site work for a water / sewer project.

Horizontal directional drilling (HDD) approximately 724 LF of uncased 34" IPS DR 13.5 HDPE and 188 LF of 34" IPS DR 13.5 HDPE. Pipe will be supplied and assembled with tracer wire by others. The project will be drilling under a creek and be constructed in conjunction with an existing, separate construction contract named "2023 Transmission Main Bid Package 1". The alignment starts at approximately station 356+35 from a valve of the existing project to ending at a valve at approximately 365+47. The deadline to ask questions is 5/14/2025 5:00 PM CST

Bid Results

Water / Sewer

$2,690,000.00

Public - County

Site Work

4

13

5

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
137
Bidding Soon
3,497
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.