Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2025 at 8:00 PM

Updated May 8, 2025

Site work and paving for a road / highway in Milton, Georgia. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

BACKGROUND AND STATEMENT OF INTENT The City of Milton is requesting proposals from qualified consultants to provide engineering services for conceptual 30-percent design plans for public infrastructure associated with the implementation of intersection, drainage and sidewalk connectivity improvements along the Redd Road corridor. As further funding is identified in the future, the City intends to add additional phases to this scope which would include further engineering services, right-of-way acquisition coordination and construction administration services. The selected firm will be expected to provide services in accordance with Tasks 1-5 and the project schedule agreed upon by the City of Milton. The City, at its discretion, may choose to negotiate the scope, fees, and schedule with the Consultant for the development of the full construction documents (Task 6) and construction services (Task 7) for the plans developed as part of this RFP. All Consultants must comply with all the general and special requirements of the RFP information and instructions enclosed. The need for this project was identified in past studies including Milton's 2023 Comprehensive Transportation Plan. The City of Milton is requesting proposals from qualified consultants to provide engineering services for conceptual 30-percent design plans, permitting requirements, right of way needs, and associated costs for the Redd Road corridor which includes the intersections of Thompson Rd, Hagood Rd, and Hopewell Rd, all in Milton, Georgia. This project also includes drainage enhancements at these intersections and priority gaps in sidewalk connectivity along the corridor. All qualified proposals will receive consideration without regard to age, handicap, religion, creed or belief, political affiliation, race, color, sex, or national origin. The City of Milton reserves the right to reject any or all bid/proposals and to waive technicalities and informalities, and to make award in the best interest of the City of Milton. Deadline for Written Questions March 12, 2025, by 5:00 PM EST Submit questions online The City will provide an official written answer to all questions on or about May 15, 2025. The City's response will be by formal written addendum.

Conceptual

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
382
Active Projects
161
Bidding Soon
2,417
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed