Published January 10, 2025 at 7:00 PM
Updated January 11, 2025
Site work and new construction of a mixed-use development in Milton, Georgia. Conceptual plans call for the construction of a municipal facility; warehouse / distribution facility; for site work for a warehouse / distribution facility; and water / sewer project.
Update: https://www.miltonga.gov/home/showpublisheddocument/7894/638697024952230000 Continuing efforts to improve the Public Works Facility behind Fire Station #43 adjacent to the Birmingham Park. Next phases are construction of a pole barn in the public works yard and a proposed 900' water 8" main line extension serving multiple departments. The pole barn will cover the rock/salt material bins to reduce the effect of weathering, extend material life and allow material to be readily available when needed. The proposed waterline extension serves multiple purposes and costs will be shared between Fire, Birmingham Park, and Public Works. Fire Station property at 750 Hickory Flat Road has long needed a waterline and hydrant near the northeast corner of the station curtilage. We have explored this possibility throughout Milton's existence due to need for firefighter training and safety. Our primary training ground at 43 does not have water access except on Hickory Flat Road and laying of 5 inch supply line blocks both the roadway and the parking lots/gas pumps, making water supply possible, but highly impractical. From a safety perspective, we have already had one building burn to the ground in the park area--water supply was an issue on this fire--and as facilities are expanded, including a future restroom for Birmingham Park and the Public Works maintenance building, the need for better access to water has only grown. The addition of a waterline and a hydrant at the back of the station parking lot would be a significant improvement in both the training and safety arenas for fire. Extending this to the Public Works building will provide substantially improved water flow and quality for this building. The water service line extended into Birmingham Park use area will provide a hydrant at the end of the line, better sourse for drinking water, be more reliable and flexible for the future restroom for Birmingham Park visitors. Project is included City of Milton Fiscal Year 2025-2031 Page No 232 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Since deployment, the Fire Department has acquired several capital assets, including four fire engines, one ladder truck, one battalion vehicle, one command trailer, one air trailer, and one TLAER trailer and one TLAER truck, as well as two golf carts. Most of this equipment and all the necessary supporting items are being housed in separate fire stations. In addition, the Fire Department stores fire hose, station supplies, lawn equipment, training equipment, tires, bulky gear, EMS supplies, and numerous other items at various stations. This has created a storage problem. This item involves constructing a large steel storage building behind Fire Station 43. The vision is a three bay building 60' x 75' that would be shared with Public Works for their equipment. A master plan of the area will be performed prior to the construction of the building. Project is Included City of Milton 2019-2025 CIP PAGE 186 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Municipal
$250,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
750 Hickory Flat Rd, Milton, GA
Related To This Project
Milton, GA
Bid Date: Feb 12 2025
Milton, GA
Bid Date: Apr 02 2025
Milton, GA
--
Milton, GA
--
Milton, GA
Bid Date: May 22 2025
Milton, GA
Bid Date: May 28 2025
Milton, GA
Bid Date: Jan 08 2025
Milton, GA
Bid Date: Dec 04 2024
Milton, GA
Bid Date: Oct 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.