BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Site work and renovation of a civil project in Burlington, Washington. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of July 18,2025, the project was awarded to Interwest Construction, Inc., with an awarded amount of $3,450,031.95.** Furnishing the necessarylabor, materials, equipment, tools, and guarantees thereof to constructthe Wastewater TreatmentPlant Influent and EffluentPump Station Upgrades. The work includes replacement of influent andeffluent pump stationelectrical, controls, instrumentation, and communications systems: providingnew influent and effluentpump station emergencygenerators; replacement ofthe influent pump stationdischarge piping with newductile iron piping; coatingof new piping and hardware in the influent pumpstation wet well; providingnew influent pump stationodor control system andodor control ducts; construction of two new CMUbuildings for the influentand effluent pump stationelectrical, controls, instrumentation, and communications systems; providingnew top slab with accesshatches for the influentpump station wet well;bypass pumping aroundthe influent pump station;providing all required construction of preloadingthe sites for the new CMUbuildings; required sitegrading; piping and appurtenances; providing allrequired plumbing, heating, and ventilating work;providing all required electrical, instrumentation andtelemetry work; restorationof all surfaces disturbedby construction activities;and provide testing, commissioning, and trainingas specified herein. Coating of the interior concretewalls and floor of the existing wet well is a Bid Additive. The Work shall be substantially complete within 260 working days afterthe commencement datestated in the Notice to Proceed. All Proposals must be accompanied by a certified check,postal money order, cashiers check, or Proposalbond payable to the "Cityof Burlington" and in anamount of not less thanfive percent (5%) of the total Proposal amount. Financing of the Projecthas been provided by Cityof Burlington, Washington. The City of Burlington expressly reserves the rightto reject any or all Proposals and to waive minor irregularities or informalitiesin any Proposal.

Award

Water / Sewer

$3,450,032.00

Public - City

Renovation, Site Work

75

23

21

7

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
123
Bidding Soon
2,795
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

August 4, 2025

Project location map

900 S Section St, Burlington, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.