Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2025 at 8:00 PM
Updated July 19, 2025
Site work and renovation of a civil project in Burlington, Washington. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
**As of July 18,2025, the project was awarded to Interwest Construction, Inc., with an awarded amount of $3,450,031.95.** Furnishing the necessarylabor, materials, equipment, tools, and guarantees thereof to constructthe Wastewater TreatmentPlant Influent and EffluentPump Station Upgrades. The work includes replacement of influent andeffluent pump stationelectrical, controls, instrumentation, and communications systems: providingnew influent and effluentpump station emergencygenerators; replacement ofthe influent pump stationdischarge piping with newductile iron piping; coatingof new piping and hardware in the influent pumpstation wet well; providingnew influent pump stationodor control system andodor control ducts; construction of two new CMUbuildings for the influentand effluent pump stationelectrical, controls, instrumentation, and communications systems; providingnew top slab with accesshatches for the influentpump station wet well;bypass pumping aroundthe influent pump station;providing all required construction of preloadingthe sites for the new CMUbuildings; required sitegrading; piping and appurtenances; providing allrequired plumbing, heating, and ventilating work;providing all required electrical, instrumentation andtelemetry work; restorationof all surfaces disturbedby construction activities;and provide testing, commissioning, and trainingas specified herein. Coating of the interior concretewalls and floor of the existing wet well is a Bid Additive. The Work shall be substantially complete within 260 working days afterthe commencement datestated in the Notice to Proceed. All Proposals must be accompanied by a certified check,postal money order, cashiers check, or Proposalbond payable to the "Cityof Burlington" and in anamount of not less thanfive percent (5%) of the total Proposal amount. Financing of the Projecthas been provided by Cityof Burlington, Washington. The City of Burlington expressly reserves the rightto reject any or all Proposals and to waive minor irregularities or informalitiesin any Proposal.
Award
Water / Sewer
$3,450,032.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2025
August 4, 2025
900 S Section St, Burlington, WA
Related To This Project
Burlington, WA
Bid Date: May 16 2025
Burlington, WA
--
Burlington, WA
Bid Date: Jun 18 2025
Burlington, WA
--
Burlington, WA
Bid Date: Sep 05 2025
Burlington, WA
--
Burlington, WA
Bid Date: May 07 2025
Burlington, WA
--
Burlington, WA
Bid Date: Mar 12 2025
Burlington, WA
Bid Date: Feb 26 2025
Burlington, WA
Bid Date: Jan 09 2025
Burlington, WA
Bid Date: Nov 26 2024
Burlington, WA
Bid Date: Mar 28 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
