BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Demolition, site work and addition to a warehouse / distribution facility in Burlington, Washington. Completed plans call for the addition of a warehouse / distribution facility; for the demolition of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

**As of June 20,2025, the project was awarded to Chad Fisher Construction, with an awarded amount of $1,340,539.84.** Project Description: This project is adding infrastructure to the Port's existing granary building so that the tenant can dry local grain before it is processed. The new development will consist of installation and erection of the following Port purchased equipment: (2) Silos Dryer unit Conveyance (3) Augers Catwalk The contractor will fabricate a conveyance support tower and some other transitions. The contractor will install concrete footings for two silos, a grain tower, a dryer unit, a conveyance tower, and flatwork connecting new and existing concrete. The dryer and conveyance system will also require utility work to provide power and gas to the units. The Engineer's cost opinion for all work is approximately $950,000. This Project Will Be Available Beginning April 15, 2025 A non-mandatory pre-bid meeting will be held at the Project Site, 11749 Westar Lane, Burlington, WA 98233, on April 29th, 2025 at 1:00 pm owner's local time. Attendance at pre-bid meeting is non-mandatory. Apr 29th 2025, 1:00 PM PDT - Apr 29th 2025, 2:00 PM PDT

Award

Warehouse / Distribution

$1,340,540.00

Public - County

Addition, Demolition, Site Work

33

10

14

3

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
85
Bidding Soon
3,145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

June 6, 2025

Project location map

11749 Westar Ln, Burlington, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.