BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2025 at 8:00 PM

Updated May 4, 2025

Site work and paving for a mixed-use development in Aurora, Illinois. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 22, 2025, at 10:00 AM at the Region One/District One Office in Schaumburg. Phase II engineering services are required for the preparation of contract plans, specifications, cost estimates, supplemental surveying, geotechnical services, and all other work to complete the project. The project's scope includes bridge reconstruction of US 30 over Blackberry Creek. The improvement includes, but not limited to, traffic signal modernization, bicycle accommodations, roadway and drainage improvements, and all other related work to complete Phase II contract plans. The completion date for this contract will be 24 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 12 - RFQ Engineering - US 30 at Orchard Road, Phase II Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Bridges / Tunnels

$6,000,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
444
Active Projects
253
Bidding Soon
3,314
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2026

Project location map

N Orchard Rd, Aurora, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.