Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 12, 2025 at 8:00 PM
Updated August 13, 2025
Site work and paving for a mixed-use development in Aurora, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; water / sewer project; and sidewalk / parking lot.
(1.79-Mile) SMART and Designed Overlay, ADA Improvements, New Shoulders Improvements include curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), (HMA) surface removal and replacement, (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement marking, pedestrian signals (APS) improvements and detector loops. Location: IL 56 (Butterfield Road), from East of IL 25 River Road to West of Church Road in the Village of North Aurora and the City of Aurora. Region 1 District 1 Federal Project # N/A County(s): Kane Key Route(s) FAP 365 Marked Route(s) : IL 56 ((Butterfield Rd)) Section(s) :2024-1031-RS State Job #(s) : C-91-080-25 PPS #(s) : 1-81179-0000 DBE% 11.00 VBP% 0.00 Contract Specifics Completion Date: 60 Working Days Questions not accepted as of June 03, 2025 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, May 23, 2025. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 211- Smart and Designed Overlay, Ada Improvements, New Shoulders Improvements Include Curb and Gutter Spot Repairs
Award
Roads / Highways
$2,713,457.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 13, 2025
July 14, 2025
Butterfield Rd, Aurora, IL
Related To This Project
Aurora, IL
Bid Date: Jun 13 2025
Aurora, IL
Bid Date: Jun 11 2025
Aurora, IL
Bid Date: Jun 12 2025
Aurora, IL
Bid Date: Jun 18 2025
Aurora, IL
Bid Date: Jun 20 2025
Aurora, IL
Bid Date: Jul 15 2025
Aurora, IL
Bid Date: Jun 19 2025
Aurora, IL
Bid Date: May 28 2025
Aurora, IL
Bid Date: Mar 10 2021
Aurora, IL
Bid Date: May 01 2025
Aurora, IL
Bid Date: May 07 2025
Aurora, IL
Bid Date: May 01 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
