Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 3, 2025 at 8:00 PM
Updated May 4, 2025
Site work and paving for a civil project in Bradley, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 24, 2025, at 9:30 AM at the Region Two/District Two Office in Dixon. Phase I and II engineering services are required for the preparation of a Combined Design Report (anticipated to be a Categorical Exclusion) and final contract plans, specifications, and estimates for reconstruction of I-57 between Grinnell Road and Armour Road. The Phase I work includes the preparation of a Combined Design Report. The work includes conducting route and land pick-up surveys, proposed design, providing maintenance of traffic, identification of roadside safety improvements, crash analysis, pavement design, and identifying drainage improvements and all other work necessary to complete the Combined Design Report. The work also includes preparing Location Drainage Studies, Roadway Geotechnical Reports, Hydraulic Reports, Structure Geotechnical Reports, and Bridge Condition Reports (BCR). Type, Size and Location plans may be required based on the BCRs. The Phase II work includes preparation of Phase II final contract plans, special provisions, and estimates (PS&E); and may consist of conducting route and land pick-up surveys; preparing structure plans; identifying utility conflicts and relocations; preparing transportation management plans, reviewing shop drawings; and all other plan drawings work necessary to complete Phase II final contract PS&E TThe Prime firm must be prequalified in the following categories to be considered for this project: Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The completion date for this contract will be 60 months after authorization to proceed The method of contractor selection has not been determined at this time. IL DOT - 35 - RFQ Engineering - I-57 From 0.3 Miles North of Grinnell Road, Phase I/II Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$3,000,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2026
I-57, Bradley, IL
Related To This Project
Bradley, IL
Bid Date: May 20 2025
Bradley, IL
Bid Date: May 12 2025
Bradley, IL
Bid Date: Jun 10 2025
Bradley, IL
--
Bradley, IL
Bid Date: Jun 13 2025
Bradley, IL
Bid Date: Jul 02 2025
Bradley, IL
Bid Date: Sep 03 2025
Bradley, IL
Bid Date: May 05 2025
Bradley, IL
--
Bradley, IL
Bid Date: Apr 25 2025
Bradley, IL
Bid Date: Mar 07 2025
Bradley, IL
Bid Date: Nov 15 2024
Bradley, IL
Bid Date: Oct 10 2024
Bradley, IL
Bid Date: Aug 21 2024
Bradley, IL
Bid Date: Aug 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
