BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Site work and paving for a road / highway in Abbeville, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Furnishing All Labor, Materials, Tools, and Equipment Necessary for the Complete Construction of: Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on Co Rd 29 From State Highway 431, North to Co Rd 54, (5.225 Mi) in Henry County. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated budget $700k-$750K

Bid Results

Roads / Highways

$712,668.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
44
Bidding Soon
524
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2025

June 20, 2025

Project location map

Co Rd 29, Abbeville, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.