BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2025 at 8:00 PM

Updated July 4, 2025

Site work for a mixed-use development in Modesto, California. Completed plans call for site work for a playground / park / athletic field.

The Park Turf Reduction, Phase 2 project includes the removal of existing turf grass and installation of drought tolerant landscape materials. A. The work is located within the City of Modesto. 1. Brewers Rose Park: 2025 Wolcott Way, Modesto, CA 95355 2. Charles M. Sharp Park: 1900 Torrid Avenue, Modesto, CA 95358 3. Creekwood Park: 521 Creekwood Drive, Modesto, CA 95357 4. James Marshall Park: 440 Sutter Avenue, Modesto, CA 95351 5. Mark Twain Park: 1201 California Avenue, Modesto, CA 95351 6. Muncy Park: 2501 Janna Avenue, Modesto, CA 95350 7. Robertson Road Park: 1001 Hammond Street, Modesto, CA 95351 8. Stockard Coffee Park: 1800 Mable Avenue, Modesto, CA 95355 9. Woodrow Park: 3101 Sherwood Avenue, Modesto, CA 95350 Question Deadline 05/09/2025 at 4:00 PM PT Email all questions to Park_Turf_Reduction_Phase_2_Bid_Questions@docs.e-builder.net no later than 7 business days prior to the bid opening. VAULT ID: 19-D-0398 Liquidated Damages: $500/day Start Date: Estimated July 2025 Project Duration: 60 Working Days License Requirements: A, B, and/or C-27 California State Contractor License Bid Bond: 10% Payment Bond: 100% Performance Bond: 100% Approximate Contract Award Date: June 2025 The payment of Prevailing Wages is required on this project. The City reserves the right to reject any or all bids or to waive any informalities or minor irregularities in a bid. No bidder may withdraw their bid for a period of ninety (90) days after the date set for the opening thereof. Estimated Bid Value: $1,206,551 SCOPE OF WORK: A. The Contractor shall furnish all labor, materials and equipment necessary to complete the work as shown in the Contract Documents. All incidental work not shown in the Contract Documents which is necessary to complete the work necessary to provide the system described, or shown, shall be furnished and installed as part of this contract at no additional cost to the City. B. The Contractor shall inspect the site to observe actual working conditions and restrictions.

Award

Playgrounds / Parks / Athletic Fields

$1,029,236.00

Public - City

Site Work

163

13

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
458
Active Projects
199
Bidding Soon
2,574
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2025

July 1, 2025

Project location map

Multiple Locations, Modesto, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.