Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 2, 2026 at 8:00 PM
Updated July 8, 2026
Site work and paving for a mixed-use development in Milwaukie, Oregon. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
https://cms2.revize.com/revize/milwaukie/BN%202027-2028%20Adopted%20Budget.pdf A detailed scope has not yet been determined. The project is included in the City's 2027-2028 Capital Improvement Program (CIP). As of July 2, 2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Transportation Improvements: The Monroe Greenway will create a nearly four- mile, continuous, low-stress bikeway from downtown Milwaukie to the 1-205 multi-use path. Once complete, it will serve as the spine of Milwaukie's active transportation network connecting users to the Max Orange Line, Max Green Line, Trolley Trail, 17th Avenue Bike Path, 1-205 path, neighborhoods, schools. and parks. The eastern segment runs from the cycle track at the intersection of 37th Avenue and Washington Street and runs along Washington Street before pivoting onto Monroe Avenue all the way to the eastern city limit at Linwood Avenue. This segment will include one ADA-compliant sidewalk along Monroe Street, ADA-compliant sidewalk on both sides of Washington Street, and incorporate traffic calming measures to make this an effective greenway. The western segment will run from the intersection of Oak Street and Monroe Street, across the railroad tracks to Campbell Street, along Campbell Street to Monroe Street, and along Monroe Street across Highway 224 and the Max Orange Line to downtown Milwaukie. SAFE/SSMP Improvements: Replace portions of existing sidewalk, remove barriers, and construct new surface overlay from 25th Avenue to 28th Avenue. Water Improvements: Approximately 210 feet of water main will be enlarged crossing Highway-224. Stormwater Improvements: Stormwater treatment facilities will be installed as required and flooding issues at the intersection of 55th Avenue and Monroe Street will be corrected. As of May 5, 2025, this project is included in the city's 2025-2030 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
$1,261,000.00
Public - City
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
SE Monroe St, Milwaukie, OR
Related To This Project
Milwaukie, OR
--
Milwaukie, OR
--
Milwaukie, OR
--
Milwaukie, OR
Bid Date: Jun 29 2026
Milwaukie, OR
Bid Date: Jul 08 2026
Milwaukie, OR
Bid Date: Apr 14 2021
Milwaukie, OR
Bid Date: Apr 13 2026
Milwaukie, OR
Bid Date: Jun 23 2026
Milwaukie, OR
Bid Date: May 08 2026
Milwaukie, OR
Bid Date: May 11 2026
Milwaukie, OR
Bid Date: Apr 28 2026
Milwaukie, OR
Bid Date: Apr 20 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
