BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated May 14, 2025

Site work and new construction of an educational facility in Bartow, Florida. Working plans call for the construction of a educational facility; and for site work for a educational facility.

The School Board of Polk County, Florida is interested in entering into a contract with a qualified Construction Management firm to provide Construction Management Services for the project(s) listed below. Work shall be of a specified nature as outlined in the contract required by the District. The Construction Manager (CM) is responsible for the successful, timely and economical completion of the construction project. Pursuant to F.S. 1010.04(5), effective July 1, 2023, School Districts, Florida College System Institutions and State Universities may not: (a) Request documentation of or consider a vendor's social, political, or ideological interests. (b) Give preference to a vendor based on the vendor's social, political, or ideological interests. To be eligible for consideration, interested firms must be qualified pursuant to the laws of the State of Florida and School Board Policies and Procedures. ***Prebid meeting: Those firms desiring to provide services for the listed project must complete and submit initial screening criteria after attending the mandatory Pre-Submittal Conference. This information may be obtained by contacting David Connell @ (863) 534-0620 x498 or via email at david.connell@polk-fl.net. Attendance at the Pre-Submittal Conference is mandatory, and a firm must be present for the entire Conference to receive credit for attending. The sign-in sheet must be signed by a firm by 2:00 pm, after which time the sign-in sheet will not be available. Firms that submit the initial screening criteria but whose signature is not on the mandatory Pre-Submittal Conference sign-in sheet will not be given consideration and the initial screening criteria package will be returned

Final Planning

Educational

$13,000,000.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
410
Active Projects
178
Bidding Soon
2,646
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2025

Project location map

550 E Clower St, Bartow, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.