BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2025 at 8:00 PM

Updated June 5, 2025

Site work, paving and outdoor lighting for a mixed-use development in Chicago, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; for outdoor lighting for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

The Public Building Commission of Chicago (PBC) has invited all Contractors to bid on PBC Contract C1623, Works Progress Administration ("WPA") Street Reconstruction (W. 58th St., South Washtenaw Ave., W. 57th St.). The WPA Street Reconstruction (W. 58th St., South Washtenaw Ave., W. 57th St.) Project is located at: W. 58th St. - West 58th Street from South Hamilton Avenue to South Damen Avenue Chicago, IL S. Washtenaw Ave. - South Washtenaw Avenue from West 36th Place to West 37th Place Chicago, IL W. 57th St. - West 57th Street from South Western Avenue to Dead End East Chicago, IL The project consists of a Works Progress Administration ("WPA") street reconstruction Project, including: full-depth pavement reconstruction of the location indicated above. Work includes but isn't limited to excavation, portland cement concrete base course, hot-mix asphalt surface course, sewer main, water main and drainage structures, water main, concrete curb and gutter, concrete sidewalks, tactile/detectable warning surface system for curb ramps, concrete driveways and alleys, lighting, thermoplastic pavement marking, signs, topsoil, sodding, tree removal and planting. Contractor will be required to prepare a Phasing and Logistics Plan within thirty (30) days of issuance of the Notice to Proceed ('NTP') for review and approval by CDOT and PBC, prior to the mobilization and commencement of any Work. The Contractor shall also be responsible for providing critical submittals, including electrical lighting (poles and luminaires), sewer and water main, and concrete mix design, as determined by the PBC, within thirty (30) days of issuance of the NTP. Question Deadline 05/26/2025 All questions regarding this contract must be submitted in writing, via email to Dee Taylor, Contract Officer at: dee.taylor@cityofchicago.org .

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
536
Active Projects
325
Bidding Soon
3,325
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2025

July 3, 2025

Project location map

Multiple Locations, Chicago, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.