Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 4, 2025 at 8:00 PM
Updated June 5, 2025
Site work, paving and outdoor lighting for a mixed-use development in Chicago, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; for outdoor lighting for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
The Public Building Commission of Chicago (PBC) has invited all Contractors to bid on PBC Contract C1623, Works Progress Administration ("WPA") Street Reconstruction (W. 58th St., South Washtenaw Ave., W. 57th St.). The WPA Street Reconstruction (W. 58th St., South Washtenaw Ave., W. 57th St.) Project is located at: W. 58th St. - West 58th Street from South Hamilton Avenue to South Damen Avenue Chicago, IL S. Washtenaw Ave. - South Washtenaw Avenue from West 36th Place to West 37th Place Chicago, IL W. 57th St. - West 57th Street from South Western Avenue to Dead End East Chicago, IL The project consists of a Works Progress Administration ("WPA") street reconstruction Project, including: full-depth pavement reconstruction of the location indicated above. Work includes but isn't limited to excavation, portland cement concrete base course, hot-mix asphalt surface course, sewer main, water main and drainage structures, water main, concrete curb and gutter, concrete sidewalks, tactile/detectable warning surface system for curb ramps, concrete driveways and alleys, lighting, thermoplastic pavement marking, signs, topsoil, sodding, tree removal and planting. Contractor will be required to prepare a Phasing and Logistics Plan within thirty (30) days of issuance of the Notice to Proceed ('NTP') for review and approval by CDOT and PBC, prior to the mobilization and commencement of any Work. The Contractor shall also be responsible for providing critical submittals, including electrical lighting (poles and luminaires), sewer and water main, and concrete mix design, as determined by the PBC, within thirty (30) days of issuance of the NTP. Question Deadline 05/26/2025 All questions regarding this contract must be submitted in writing, via email to Dee Taylor, Contract Officer at: dee.taylor@cityofchicago.org .
Post-Bid
Sidewalks / Parking Lot
$400,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2025
July 3, 2025
Multiple Locations, Chicago, IL
Related To This Project
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Jun 20 2025
Chicago, IL
--
Chicago, IL
Bid Date: Jun 05 2025
Chicago, IL
Bid Date: Jul 23 2025
Chicago, IL
--
Chicago, IL
Bid Date: Jul 29 2025
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Jul 01 2025
Chicago, IL
Bid Date: May 29 2025
Chicago, IL
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
