Site work and paving for a mixed-use development in Mondovi, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Project 1: Pulverize and Repave 850th Street From State Highway 85 North 1/2 Mile. Total Project Length Approximately 2640 Feet. 1. Pulverization of Existing Pavement. Approximately 550 Square Yards. 2. Preparation of Roadway Subgrade. Salvage of Base Course and Fragmented Pavement. Lump Sum Bid Required for This Item. 3. Crushed Limestone Base Course Added to Create a Total Thickness of 6 Inches of Base Course, Compacted. Salvaged Base Course to Be Used if Possible. Approximately, 1600 Tons Required. 4. Machine Compaction, Watering, and Fine Grading of Road Base. Incidental to Item 3. 5. Placement of Asphaltic Pavement, 2.5 Compacted Thickness, 20 Feet Wide. Approximately 920 Tons Required. 6. 2 Feet Wide Crushed Limestone Shoulders Compacted. Approximately, 250 Tons of Gravel Required. 7. Milling of Joints at South and North Ends of Project. Approximately, 40 Linear Feet. Incidental to Item 2. Project 2: Excavate and Place Fabric, Breaker Run, and Base Course 10th Avenue From Approximately 1500 Feet East of Rock Creek Bridge East to 968th Street. Total Project Length Approximately 1320 Feet. Project is to Include the Following: 1. Preparation of Roadway Subgrade. Including Excavation 12 Below Subgrade. Salvage of Base Course and Fragmented Pavement, if Possible. Lump Sum Bid Required for This Item. 2. Replacement of 36” Diameter by 36’ Long Corrugated Metal Culvert. Salvage and Reuse Existing, If Possible. 3. Placement of 12” of Breaker Run Limestone 25 Feet Wide. Approximately, 1200 Cubic Yards Required. 4. Crushed Limestone Base Course Added to Create a Total Thickness of 6 Inches of Base Course, Compacted. Salvaged Base Course to Be Used if Possible. Approximately, 800 Tons Required. 5. Machine Compaction, Watering, and Fine Grading of Road Base. Incidental to Item 3. 6. 1320 Feet of Geo-technical Fabric 24 Feet Wide. Approximately 3500 Square Yards. 7. Placement of Asphaltic Pavement, 2.5” Compacted Thickness, 20 Feet Wide. Approximately 460 Tons Required. 8. 2 Feet Wide Crushed Limestone Shoulders Compacted. Approximately, 125 Tons of Gravel Required. 9. Milling of Joints at East End of Project. Approximately, 20 Linear Feet. Incidental to Item 2 10. Mechanical Compaction Required. Incidental to All Items. Project 3: 2” Thick Asphaltic Overlay 10th Avenue From Rock Creek Bridge East to 968th Street. Total Project Length Approximately 1500 Feet. Project is to Include the Following: 1. Placement of Asphaltic Pavement With Binder, 2.0” Compacted Thickness, 20 Feet Wide. Approximately 415 Tons Required. 2. 2 Feet Wide Crushed Limestone Shoulders Compacted. Approximately, 140 Tons of Gravel Required. 3. Milling of Joints at East End of Project. Approximately, 60 Linear Feet. Incidental to Item 2.Project 4: Asphaltic Pavement and Shouldering 10th Avenue From Approximately 1500 Feet East of Rock Creek Bridge East to 968th Street. Total Project Length Approximately 1320 Feet. Project is to Include the Following: 1. Placement of Asphaltic Pavement, 2.5” Compacted Thickness, 20 Feet Wide. Approximately 460 Tons Required. 2. 2 Feet Wide Crushed Limestone Shoulders Compacted. Approximately, 125 Tons of Gravel Required. 3. Milling of Joints at East End of Project. Approximately, 20 Linear Feet. Incidental to Item 2. This Project to Be Executed in the Fall of 2025 to Provide for Compaction of Base by Traffic. Please Provide Individual Bids for Each Project Using the Following Unit Prices: 1. Asphalt Paving: Tons 2. Crushed Limestone Base: Tons 3. Crushed Limestone Shoulders: Tons 4. Preparation of Roadway Subgrade: Lump Sum 5. Pulverization of Existing Pavement Square Yards Scheduled Completion by October 31, 2025. The Town of Rock Creek Reserves the Right to Reject Any or All Bids. For More Information and Bid Tabs Contact Town Chair, Rachel Kummer N1411 830th Street, Mondovi, Wi 54755, Phone 715-279-1180 (Mobile).
Post-Bid
Roads / Highways
$200,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2025
June 19, 2025
Multiple Locations, Mondovi, WI
Related To This Project
Mondovi, WI
Bid Date: Jun 17 2025
Mondovi, WI
Bid Date: Jul 28 2025
Mondovi, WI
Bid Date: Jun 11 2021
Mondovi, WI
Bid Date: Feb 21 2025
Mondovi, WI
Bid Date: Sep 18 2024
Mondovi, WI
--
Mondovi, WI
Bid Date: Feb 10 2026
Mondovi, WI
--
Mondovi, WI
Bid Date: Jul 16 2024
Mondovi, WI
Bid Date: Jun 13 2024
Mondovi, WI
Bid Date: May 21 2024
Mondovi, WI
Bid Date: Apr 16 2024
Mondovi, WI
--
Mondovi, WI
Bid Date: Nov 10 2020
Mondovi, WI
Bid Date: Jul 18 2019
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.