Published June 5, 2025 at 8:00 PM

Updated June 6, 2025

Site work and new construction of a transportation facility in Norway House, Manitoba. Completed plans call for the construction of a 3,834-square-foot, one-story above grade transportation facility; and for site work for a transportation facility.

Reference Number 0000292853 Question Acceptance Deadline 2025/05/16 12:00:00 PM CDT Construction of a new airport terminal building, including excavation, grading, backfill, drainage, wood frame structure, walls, pedestrian and overhead doors, mechanical, and electrical works (including security, access control, and alarm system). The Work must be completed by no later than MARCH 30, 2027 Scope of Work The work to be performed under this specification shall consist of the supply of all necessary professional engineering, design services, management, labour, supervision, material, plant, tools, transportation, and warranty of workmanship and materials supplied by the Contractor for the complete construction of a new airport terminal building at the Norway House Airport. Project includes but is not limited to: a) All necessary building and service permits, b) Locate all existing underground utilities as required, c) Supply, construct and maintain approximately 350 lineal feet of 6 ft high, steel, temporary fencing around construction area for entire duration of construction, d) All Arch-Bldg, Structural, Mechanical and Electrical items as identified on attached DGH Engineering sealed plans, e) Complete construction of concrete foundation and floor, concrete approach pads, concrete stairs and ramp, bollards, and concrete retaining wall, f) Complete construction of a wood frame terminal building, with minimum dimensions of 42'-0" wide by 90'-0" long (outside to outside of bottom plates) with a minimum 9'-0" height from u/s of trusses to finished floor level, g) Complete construction of interior space including waiting room, offices, washrooms, baggage handling area, vestibules, janitors room, mechanical room, multi purpose room, h) All mechanical services, equipment and installation, a. Commissioning of mechanical HVAC systems by an independent third party certified agent paid for by contractor, i) All electrical services, equipment and installation, j) Construct swale between retaining wall and equipment shed, k) Final grading around perimeter of building, and between retaining wall and equipment shed. Site improvements including parking fence, splash pads, etc. I) Provide training to MI staff on mechanical, security, access control and security systems installed. Bid Bond - 10 % Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Bid Results

Transportation Terminals

$2,443,949.00

Public - State/Provincial

New Construction, Site Work

47

8

4

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2025

August 4, 2025

Project location map

Hwy 373, Norway House, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.