Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 26, 2025 at 8:00 PM
Updated May 27, 2025
Site work and paving for a civil project in Senneville, Quebec. Working plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and water / sewer project.
Bid is cancelled "As per the owner the project has been cancelled. team is actively seeking updated information." Reference number: 20068524 Deadline for receipt of complaints: 2025-05-16 The work covered by the plans and specifications consists mainly of the following: - Reconstruction of the storm outfall located on the property at 26 chemin de Senneville with a 900mm-diameter pipe, including reconstruction of the retaining wall at the outfall and refurbishment of the landscaping; - Abandonment of the 150mm drinking water pipe on chemin de Senneville and installation of a 250mm-diameter pipe, including replacement of service connections and two hydrants between McKenzie Avenue and Tunstall Avenue. Addition of 525mm and 675mm-diameter storm mains on this stretch of Senneville Road; - Replacement of the 150mm drinking water main, including replacement of service connections and installation of a 900mm-diameter storm pipe in the front lot under the McKenzie Avenue roadway, between 2 McKenzie Avenue and the Pacific Avenue intersection; - Abandonment of the back-lot storm pipe and relocation of existing private connections to the new storm pipe; - Installation of a 600mm-diameter front-lot storm pipe under the pavement on Pacific Avenue, between 32 Pacific Avenue and the McKenzie Avenue intersection; - Rehabilitation of pavement structure and paving on McKenzie and Pacific avenues; - Construction of curbside valley on Pacific Avenue; - Curbside ditch construction and profiling on McKenzie, replacement of private culverts and private driveway repairs; - Rehabilitation of grounds and landscaping. The contract should be awarded to the lowest compliant bidder at a special meeting of the municipal council to be held around mid-July 2025. The contractor should therefore be able to start work around August 4, 2025. In addition, under the terms of the environmental authorization issued for this project, work on the riparian strip located on the property of #26 Senneville must be carried out between August 1 and October 31, 2025.
Final Planning
Water / Sewer
$1,300,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 27, 2025
November 26, 2025
Multiple Locations, Senneville, QC
Related To This Project
Senneville, QC
Bid Date: Jun 12 2025
Senneville, QC
Bid Date: Oct 24 2024
Senneville, QC
Bid Date: Sep 11 2024
Senneville, QC
Bid Date: Sep 11 2024
Senneville, QC
--
Senneville, QC
Bid Date: Dec 05 2023
Senneville, QC
--
Senneville, QC
--
Senneville, QC
Bid Date: Apr 14 2022
Senneville, QC
--
Senneville, QC
Bid Date: Sep 07 2023
Senneville, QC
Bid Date: Jul 24 2023
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
