Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 18, 2026 at 7:00 PM
Updated February 19, 2026
Renovation of an educational facility in Moorcroft, Wyoming. Completed plans call for the renovation of a educational facility.
**As of February 16th, 2026, this project has not yet been awarded. The project is expected to be awarded Tomorrow" Replacement of the Rubber Athletic Gym Flooring and Two Ceiling Suspended Backstops, Located at Moorcroft Elementary School, 13 Country Lane, Moorcroft, Wy 82721. Any questions can be sent to Randy Gill at gillr@crook1.com or call 307-283-2299 X 1101 Crook County School District #1 Reserves the Right to Reject Any or All Bids and to Waive Irregularities or Informalities in Any Bid or in Bidding and Do Not Bind Themselves to Accepting the Low Bid, but Rather, the Bid That is in the Best Interest of the School District. Ccsd#1 is an Equal Opportunity Employer, and All Awards Will Be Governed by the Equal Opportunity Clause. MES Gym project scope of work Flooring Removing the existing Mondo Advance 8mm gym floor with the exception of the flooring underneath the retracted bleachers from the wall to the toe board on the bleachers. Replacing with Mondo Advance 8mm gym flooring and welding into the cutline in front of the retracted bleachers. 6500 Ft2 Removing existing vinyl cove base and replacing with new vinyl cove base (Color match existing). 250 Linear Ft Paint court lines for a full-sized HS basketball court (black) and full-sized HS Volleyball court (White) with Mondo approved paint Per NFHS guidelines. Also, include painting a free throw line for each of the 4 side court backstops. Backstops Removing (2) existing rear folding ceiling mounted backstops. Replace with (2) side folding ceiling mounted backstops that can be mounted 7' from the end wall. Include electric height adjusters on both units Existing back boards and rims will be re-installed on new backstop structure. Include shot clock mounting brackets for both of the new backstop structures. A Genie scissor lift will be provided by the school. Relevant measurements include Ceiling Height: 24' Distance between ceiling trusses: 11'3" Distance from end wall to first ceiling truss: approximately 10'
Award
Educational
$116,960.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 13, 2026
February 12, 2026
13 Country Ln, Moorcroft, WY
Related To This Project
Moorcroft, WY
Bid Date: Jul 15 2025
Moorcroft, WY
Bid Date: May 12 2026
Moorcroft, WY
Bid Date: May 12 2026
Moorcroft, WY
Bid Date: Jun 05 2026
Moorcroft, WY
Bid Date: Mar 03 2025
Moorcroft, WY
Bid Date: Aug 20 2024
Moorcroft, WY
Bid Date: Jul 18 2024
Moorcroft, WY
Bid Date: May 09 2024
Moorcroft, WY
Bid Date: Apr 23 2024
Moorcroft, WY
Bid Date: Apr 03 2024
Moorcroft, WY
Bid Date: Nov 15 2023
Moorcroft, WY
Bid Date: Apr 09 2019
Moorcroft, WY
Bid Date: Oct 27 2023
Moorcroft, WY
Bid Date: Mar 11 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
