Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 16, 2026
Site work and paving for a mixed-use development in Troutdale, Oregon. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and water / sewer project.
Region 1 US30BY Curb Ramps, Phase 2, Northeast Portland Hwy, Eric Vortvedt, DEA, PM, Jay Davenport, RE Multnomah County: US30BY Curb Ramps, Phase 2 Project on the Northeast Portland Highway (Rt. No. US30BY) from St. Johns to Portland. FAP No. S123(025). ($ 5,000,000 - $ 10,000,000). Req. approx. 3,500 ft2 temp sign; 10 ea seq arr; 5,800 hr flag; 5 ea flag sta light; 345 ea TCS; 45 ea RR flag; 2,260 ft2 temp pvmt bar; 1,112 ft stripe rem; 7,121 ft2 bar rem; 3,350 ft PCD; 101 ea temp curb ramp; 720 ft2 temp walk; 151 ea inlet protect; 500 ton contam soil disp; 13 ea soil sample; const surv work; 13,000 yd2 rem surface for curb ramp; 13,900 ft sawcut; 70 ft vid insp; 96 ft pipe; 11 ea conc inlet; 16 ft drain curb; 131 ea adjust structure; 1,050 yd2 CPPR; 4,200 ton aggr base; 1,450 ton ACP; 1,100 ft2 asph slope pave; 19,100 ft2 pvmt rep; 50 yd2 conc pvmt rep; 8,900 ft conc curb; 59,290 ft2 conc surface; 3,400 ft2 trunc dome; 2,850 ft pvmt marking durable; 7,717 ft2 pvmt bar; 16 ea crosswalk close; 3,112 lb sign supp; 15 ft2 sign; traff sig mod; 200 yd3 topsoil; 70 yd3 bark mulch; 3,500 ft2 weed cntrl geotext. This project requires Railroad Insurance. Completion Time: June 1, 2028. Classes of Work: A) Miscellaneous Highway Appurtenances, or B) the combination of 1) Earthwork and Drainage & 2) Electrical. This Project Contains Asphalt Fuel Escalation Clause. Project Manager: Jay Davenport, Email: Jay.davenport@odot.oregon.gov The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 002 - US30BY Curb Ramps, Phase 2 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Sidewalks / Parking Lot
$10,000,000.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2026
August 10, 2026
US-30, Troutdale, OR
Related To This Project
Troutdale, OR
--
Troutdale, OR
Bid Date: Jun 04 2025
Troutdale, OR
Bid Date: Jun 05 2025
Troutdale, OR
--
Troutdale, OR
Bid Date: Apr 14 2021
Troutdale, OR
Bid Date: Nov 13 2025
Troutdale, OR
Bid Date: Nov 25 2025
Troutdale, OR
Bid Date: Feb 05 2026
Troutdale, OR
--
Troutdale, OR
Bid Date: May 20 2025
Troutdale, OR
Bid Date: Jul 21 2025
Troutdale, OR
Bid Date: Feb 23 2022
Troutdale, OR
Bid Date: Apr 17 2025
Troutdale, OR
Bid Date: Apr 22 2025
Troutdale, OR
Bid Date: Apr 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
