Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Site work for a playground / park / athletic field in Mobile, Alabama. Completed plans call for site work for a playground / park / athletic field.

SCOPE OF WORK: The general scope ofthe work includes but is not limited to: Installation of new artificial turffootball field for USA Marching Band. The general scope of the work includes but is not limited to construction of an artificial turf football field for use as the USA Marching Band Practice Field. Project includes minimal grading, installation of underdrains, and perimeter curb, drainage stone, and artificial turf and infill material.

Award

Playgrounds / Parks / Athletic Fields

$690,850.00

Public - State/Provincial

Site Work

17

12

14

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
67
Bidding Soon
1,013
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

September 1, 2025

Project location map

307 N University Blvd, Mobile, AL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed