BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2025 at 8:00 PM

Updated May 24, 2025

Renovation of a mixed-use development in Methuen, Massachusetts. Completed plans call for the renovation of a educational facility.

Project Water Heater Replacement for the Comprehensive Grammar School A. This contractor shall refer to Division 1 for additional scope items required by Contract including but not limited to the listed as Summary of Work Multiple Prime Contracts for Scope of Work Summary by Contract. B. The following is a general listing of work items to be provided under this Contract. Work indicated is not necessarily all inclusive, nor shall it limit the extent of the work or exclude any work shown or specified and not listed. C. Contractor shall furnish all materials, equipment, and labor to make the following complete installations: 1. Temporary water as required for work and that is necessary to maintain continuous service to building use and occupants. 2. Schedule shutdowns in advance with the Owner. 3. Cutting and patching as required to accomplish the work indicated including painting finish work. 4. Complete hot water, hot water return, tempered water, and cold water distribution systems as indicated on plans for all new plumbing equipment. 5. Complete natural gas distribution systems as indicated on plans for all new plumbing equipment. 6. Furnishing and installing of plumbing equipment and specialties. 7. Insulation and Identification of piping and valves as required by the specifications but not limited to pipe identification and valve identification for all systems. 8. Sleeves and plates including fire stop material. 9. Testing, start-up and balancing of all plumbing installations to include domestic hot water, domestic cold water, and domestic hot water return systems. Balancing work shall include rebalancing of all existing and new domestic hot water systems. 10. Servicing of plumbing equipment installed as required during guarantee period for a minimum of one year after Owners acceptance. 11. Provide competent factory-trained personnel at site for the purpose of instructing Owner's personnel in proper operation and maintenance of all new plumbing equipment. 12. Preparation and submission of coordination drawings to include coordination with all trades involved in the work areas. 13. All work as shown and indicated on plumbing drawings and as specified in Division 22. Plumbing demolition work shall include but not be limited to the complete removal of material and equipment from the site. Question Deadline 05/16/2025 All questions concerning the IFB must be submitted in writing through the bid request portal or emailed to yerosario@methuen.k12.ma.us.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

10

10

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
588
Active Projects
336
Bidding Soon
4,213
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2025

June 17, 2025

Project location map

100 Howe St, Methuen, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.