Published July 18, 2025 at 8:00 PM
Updated July 19, 2025
Renovation of a transportation facility in Boston, Massachusetts. Completed plans call for the renovation of a transportation facility.
Contractor Qualification DCAMM Certificate CM@R Trade Prequals - This project creates a post-security connection between existing terminals A and B. It will include renovations to existing facilities in proximity of Gates A11 and Gates B1 to B3, new and repurposed pre and post security passenger amenities, a new Terminal A exit lane, and a bus boarding gate. Sub Bid Category Acoustical Tile; Electrical; Elevators, Escalators, & Moving Walkways; Fire Protection; Glass & Glazing; Hvac; Masonry; Miscellaneous and Ornamental Irons; Painting; Plumbing; Resilient Flooring; Roof All questions relative to your submission shall be directed to CPBidQuestions@massport.com Deadline for submission of written questions Wednesday, May 21, 2025, at COB The work includes the following specification sections of the Massport Standard Division & Technical Specifications for: o Acoustical Tile: (090003) o Electrical: (260001) o Elevators: (140001) o Fire Protection: (210001) o Glass and Glazing: (080002) o Heating, Ventilation, and Air Conditioning (HVAC): (230001) o Masonry: (040001) o Miscellaneous Metals: (050001) o Painting: (090007) o Plumbing:(220001) o Resilient Flooring: (090005) o Roofing (070002) o Terrazzo: (090006) o Tile: (090002) o Waterproofing Damp proofing Caulking (070001) The construction of a new post security connector connecting Terminal A to Terminal B. This is the final phase to create post-security connectivity between all Logan Airport terminals. Terminal A is the only terminal that is not directly connected post-security to the other terminals. This project will enable the circulation of all screened passengers through the secured area of all terminals at Logan International Airport, improving transfers and connections to and from other domestic and international destinations for all airlines. Specific Scopes of Work include, but not limited to the following: 1. A new Post-Security Connector connecting Terminal A to Terminal B between gates A11 and B1 2. The modifications of the existing public connector between Terminals A and B to become part of the Post-Security Connector 3. A new Upper Level public connector, connecting a portion of the existing public connector to Terminal B 4. New vertical circulation at Terminal B from the Upper Level public connector down to both the Departures and Arrivals Levels 5. Modifications to the Terminal B Gate B1-B3 Holdrooms to integrate the new Post-Security Connector 6. Renovations to existing facilities 7. Creation of a new shadow space 8. The relocation of Gate A11, including the PBB, fuel pit, and striping, with a new fixed walk segment 9. Creation of two new Automatic Exit Lanes at Terminal A 10. Modifications to the existing A3 Checkpoint to accommodate the new Automatic Exit Lanes 11. The project will also include the improvement of the vertical circulation at Terminal A Satellite between level 1 and departure levels. This part of the project is still under conceptual design. The total estimated cost of the Project is approximately $77,000,000 and the construction duration is approximately THIRTY TWO (32) MONTHS. The notice to proceed for construction is expected in JULY 2025
Post-Bid
Transportation Terminals
$77,000,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2025
July 1, 2025
To Be Determined, Boston, MA
Related To This Project
Boston, MA
Bid Date: May 22 2025
Boston, MA
Bid Date: Jun 05 2025
Boston, MA
Bid Date: Jun 05 2025
Boston, MA
Bid Date: Jun 12 2025
Boston, MA
Bid Date: May 28 2025
Boston, MA
Bid Date: Jun 11 2025
Boston, MA
--
Boston, MA
Bid Date: May 23 2025
Boston, MA
Bid Date: Jun 12 2025
Boston, MA
Bid Date: May 14 2025
Boston, MA
Bid Date: Jun 13 2025
Boston, MA
--
Boston, MA
Bid Date: Jun 10 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.