BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2025 at 8:00 PM

Updated May 29, 2025

This is a service / maintenance or supply contract in East Hartford, Connecticut. Contact the soliciting agency for additional information.

The Stadium is an approximately 40,000 seat open-air facility located in East Hartford, Connecticut designed to meet NCAA Division 1-A requirements for football, while accommodating other turf events such as soccer, rugby, and lacrosse. The Stadium serves as the home of the University of Connecticut Husky football program, and hosts other athletic, cultural, entertainment and civic events throughout the year. The Stadium is located on a 157 acre parcel. Additional information on the Stadium can be found at online. One firm will be selected to provide Portable Restroom services under contract with Global Spectrum, L.P. This contract will commence on July 1, 2025 for a period of three (3) years. Global Spectrum, L.P. retains the option to extend the term for up to two (2) additional years. Notice of the exercise of such two-year extension option will be given by Global Spectrum, L.P. to the Contractor no later than ninety (90) days prior to the previously scheduled expiration of the term. Global Spectrum, L.P. further reserves the right to reject any and all submissions from any or all respondents and to republish and/or cancel the RFP. BACKGROUND Pratt & Whitney Stadium at Rentschler Field is an open-air facility occupying 8.5 acres of a State of Connecticut owned 157 acre parcel in East Hartford, Connecticut. The total Stadium capacity is 40,642, consisting of 38,110 permanent seats with an additional 2,532 standing room capacity in the scoreboard plaza. The stadium bowl overlooks a natural grass playing surface. The seating consists of a lower deck surrounding the field and an upper deck north, south, and east. There is an extensive concourse between the upper and lower seating areas and is surrounded by nine buildings containing concession and rest room facilities. All seating is accessed by entering the concourse from four main gates. Located on the south side of the stadium is a five story structure with levels for club seating, 38 suites, press, and radio and television broadcasts. Additional facilities are located on the east end of the stadium for locker, training, and equipment rooms. The southeast end of the stadium is the location for operations and back of house functions.

Post-Bid

Arenas / Stadiums

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
63
Bidding Soon
5,190
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

July 1, 2025

Project location map

615 Silver Ln, East Hartford, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.