BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2021 at 8:00 PM

Updated June 11, 2025

Site work for a water / sewer project in East Hartford, Connecticut. Completed plans call for site work for a water / sewer project.

***As of March 18, 2021 project has been awarded with the amount of 107,428.80. Work under this contract includes reconstruction of an existing drainage outfall at the cul-de-sac at the end of Springside Avenue in the Town of East Hartford. It also includes other appurtenant work such as shoring, riprap scour hole, and surface restoration. Requests for information (RFIs) will be accepted via email to the Purchasing Agent on or before FRIDAY, FEBRUARY 26, 2021 Bid security in the form of a 5% bid bond, payable to the Town of East Hartford, is required of all bidders and a 100% Performance Bond will be required of the awarded bidder. This contract is subject to state set-aside and contract compliance requirements The Town reserves the right to reject any or all bids, or any part of all bids, to waive any informality, and reserves all other rights as detailed in the Contract Documents when such action is in the best interest of the Town. The Town is an equal opportunity employer. Contractor must comply with all Federal, State and Local requirements under this contract. Questions: Call the Purchasing Department at (860) 291-7271 or email at menman@easthartfordct.gov Estimated project value: $100,000 - $120,000

Award

Water / Sewer

$107,428.00

Public - City

Site Work

7

1

2

4

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
890
Active Projects
389
Bidding Soon
7,047
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2021

April 1, 2021

Project location map

Springside Ave, East Hartford, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.