EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 7, 2025 at 8:00 PM

Updated July 9, 2025

Renovation of a mixed-use development in Indianapolis, Indiana. Completed plans call for the renovation of a educational facility; and laboratory facility.

** As of July 07, 2025, project was awarded to SCS Construction Services, Inc., with no awarded amount ** Indianapolis Campus - ET Mechanical Engineering Machine and Testing Labs Utilities - 2025 Doc note - All orders must be placed online but bidders may choose to pick up orders at: Purdue Print & Digital Services delivered by Xerox: 698 Ahlers Drive West Lafayette, IN 47907 Phone: 765-49 Deposits for hard copy must be in a form of a check. Please mail all deposit checks to Repro Graphix, Inc.; 437 N. Illinois St.; Indianapolis, IN 46204. Please scan and email a copy of your check once placing your hard copy deposit set order to plans@reprographix.com Question Deadline 05/26/2025 Bidders contemplating submitting a Bid for the proposed project who are in doubt as to the true meaning of any part of the Contract Documents shall submit to the Architect Documents returned in good condition within the time allotted or winning bidder can request their deposit check to be returned and must include a self-addressed stamped envelope (SASE) or UPS account number. If a SASE is not included, the check will be voided. The Principal Subcontractor Questionnaire listing the names of the bidder's principal subcontractors shall be submitted with the bid. The remainder of the Questionnaires and Material Lists shall be submitted prior to 3:00 p.m. (EDT) on the 12th day of June 2025, to: Capital Asset Management 2550 Northwestern Avenue, Suite 1100 West Lafayette, IN 47906 Phone (765) 494-0580 Each bid must be accompanied by a Contractor's Combination Bid Bond and Bond for Construction in the form included in the specifications made payable to The Trustees of Purdue University in an amount equal to the maximum total of the base bid and any alternate bids, guaranteeing the execution and faithful performance of the contract for the work if awarded. The Board of Trustees of The Trustees of Purdue University reserves the right to reject any and all bids and to waive, to the extent permitted by law, any of the terms, conditions and provisions contained in this Advertisement for Bids or the Instructions to Bidders or any informality, irregularity or omission in any bid, provided that such waiver shall, in the discretion of the Board of Trustees, be to the advantage of The Trustees of Purdue University. Project includes renovating ET-104, ET-121, and ET-126, and associated or adjacent spaces, including for Mechanical, Electrical, Plumbing, and Technology (MEPT) systems, as indicated on the Drawings, for Mechanical Engineering (ME) machine and testing labs and associated equipment.

Award

Laboratories

$855,900.00

Public - State/Provincial

Renovation

31

25

17

8

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Demonstration and Training, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping, Smoke Seals, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Facility Storm Drainage Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Enclosed Bus Assemblies, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
40
Bidding Soon
805
All Active Projects
250
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

June 23, 2025

img_map_placeholder

799 W Michigan St, Indianapolis, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.