Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 17, 2025 at 8:00 PM
Updated June 19, 2025
Site work and renovation of a water / sewer project in Rockwall, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
SUMMARY OF WORK You agree to furnish all equipment, material, labor, supervision, and insurances for the Work Package #3- Meter Vault per specifications below for the RCH Take Point & Pump Station Project including Addenda noted in Article 1.4 above consists of the following: Excavation and Backfill Yard Piping from NTMWD Tie-in to GST Meter Vault Construction Installation of CMAR provided equipment Coordination with CMAR's electrician PLEASE NOTE: The following list of items have been pre-purchased for this package: (1) 18" AWWA BDL Offset BFW w/EMO Class 150B (1) 18" Bailey Sleeve Valve Model B10s w/Auma Actuator. (1) 18" Westfall Flow Conditioner Model 3000 SCH40s (2) 24" AWWA DBL Offset BFV Class 150B W/2' Carbon Steel Extended Bonnet. (1) 24" AWWA DBL Offset BFV Class 150B. (2) 42" AWWA DBL Offset BFV Class 150B W/2' Carbon Steel Extended Bonnet. All Electrical Work PLEASE NOTE: All Electrical work for this package will be carried under separate contract and should not be included in this proposal The General Contractor shall provide the services of a pre-qualified Process Control Systems Integrator (PCSI), as a first-tier subcontractor, who shall perform all work necessary to select, furnish, configure, customize, program/configure, troubleshoot, install, connect, calibrate, and place into operation all specified equipment and instrumentation hardware/software specified within ITEM 909, except for those services and materials specifically noted. This Item covers the testing requirements for all devices and systems furnished and installed by the Process Control System Integrator (PCSI), and the Application Services Provider (ASP) as detailed in the Contract Drawings and as described in the related Items of Item 909. Provide all equipment, materials, incidentals and labor, necessary to perform and coordinate the overall system training for the Process Control System. The Process Control Systems Integrator (PCSI) shall provide the Programmable Logic Controllers (PLC) programming, testing of PLC logic, startup/training activities associated with programmed portion of the PLCs, the Human Machine Interface (HMI) graphics development, HMI software configuration, database development, report development, and startup/training activities associated with the configured portions of the HMI system. These services will be described as the Application Service Provider (ASP) work. The Process Control System Integrator (PCSI) shall furnish, install, and test all field-mounted instrument and appurtenances, major systems, panels, and subassemblies as detailed on the Drawings and in the P&ID Drawings. Furnish and install fully functional control panelsto manually and automatically operate control systems as specified in the detailed requirements of the instrumentation Items of Item 909. ThisItem of the specifications describesthe requirementsfor miscellaneous equipment to be furnished by the Process Control System Integrator (PCSI) under other Items of the specifications as listed in the related work paragraph of this Item . This Item describes the process control descriptions for the RCH Water Supply Corporation Meter Vault and the North Texas Municipal Water District (NTMWD). The Process Control Systems Integrator (PCSI) shall provide the Programmable Logic Controllers (PLC) programming, testing of PLC logic, startup/training activities associated with programmed portion of the PLCs, the Human Machine Interface (HMI) graphics development, HMI software configuration, database development, report development, and startup/training activities associated with the configured portions of the HMI system. These services will be described, herein, as the Application Service Provider (ASP) work. This Item of the Specifications describes the requirements for Communications Interface Equipment and Systems to be furnished under other Items of the Specifications as listed in the Related Work paragraph of this Item .
Bid Results
Water / Sewer
$3,000,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2025
July 7, 2025
To Be Determined, Rockwall, TX
Related To This Project
Rockwall, TX
Bid Date: Jun 17 2025
Rockwall, TX
--
Rockwall, TX
Bid Date: May 27 2025
Rockwall, TX
Bid Date: May 27 2025
Rockwall, TX
--
Rockwall, TX
Bid Date: Jun 04 2025
Rockwall, TX
Bid Date: May 27 2025
Rockwall, TX
--
Rockwall, TX
--
Rockwall, TX
--
Rockwall, TX
Bid Date: May 06 2025
Rockwall, TX
Bid Date: May 08 2025
Rockwall, TX
Bid Date: May 15 2025
Rockwall, TX
Bid Date: May 06 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
