BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 9, 2025 at 8:00 PM

Updated June 10, 2025

This is a service / maintenance or supply contract in Washington, District of Columbia. Contact the soliciting agency for additional information.

As of June 4, 2025 the Government anticipates releasing RFI responses on Friday, June 6. The purpose of this solicitation is to award multiple indefinite-delivery, indefinite-quantity (IDIQ) contracts for anticipated construction needs over the next five years. Named the Global Multiple Award Construction Contract (GMACC) program, the Federal Bureau of Investigation (FBI) has an ongoing requirement for a wide range of construction including but not limited to general construction, new construction, real property demolition and repairs, retrofit/renovation of complete building systems, site work, site utilities, and roadways. The type of real property includes but is not limited to operations buildings, hangars, commercial buildings and their mechanical and electrical systems, administrative offices, training centers, data centers, and firing ranges. Project delivery methods include, but are not limited to, Design-Build (DB), Design-Bid-Build (DBB), and Progressive Design-Build (PDB). Due to the nature of these construction methods, a combination of General Contractor and Architectural/Engineering (A/E) services are expected over the life of the program. Performance location is categorized by region between the National Capital Region (Washington, D.C, Quantico, VA, and Clarksburg, WV); Redstone Arsenal, AL; other sites across the domestic United States; and/or foreign overseas locations as needed. Contractors are required to provide all labor, supervision, equipment, materials, and design services required to perform construction task orders resulting from the IDIQ. Inherent in providing these services, Contractors shall provide the supervision and management effort necessary for efficient, safe, and effective administration and control of work performed. Task order projects to be awarded under the GMACC will be accomplished primarily using a delivery methods including Design-Build (DB), Design-Bid-Build (DBB), and possibly Progressive Design-Build (PDB), dependent on each task order projects needs, scope, magnitude, and complexity. A successful project outcome will depend on the trust and collaboration between the project stakeholders: Tenants, consultants, and delivery team. The FBIs commitment to excellence places a strong emphasis on design quality and construction functionality and aesthetics. GMACC awardees are expected to understand and be prepared to follow the principles of the Design-Build Institute of America's (DBIAs) Design-Build Done Righ Best Practices. This is a two-phased Best Value Tradeoff source selection conducted in accordance with FAR 15.101-1, Tradeoff process. Qualifications will be evaluated in Phase I to determine which offerors are most highly qualified to submit price and technical proposals for Phase II. Evaluation of Phase II proposals shall result in a multiple award IDIQ to establish three pools of contract holders: Region 1 (NCR), Region 2 (Redstone Arsenal), and Region 3 (OUS). All responsible sources may submit a Phase I proposal. In Phase I, seven (7) to twelve (12) offerors per region will be advised to continue into Phase II based on their qualifications including past performance, key personnel & team organization, and organization & management plans. Only the firms which receive the highest confidence ratings across Factors 3-5 in Phase I will be encouraged to continue and submit a proposal in response to the Phase II RFP. The FBI seeks only the most highly qualified firms as business partners for the life of this program. The Phase II evaluation will be conducted using the methodology in FAR 15.3, Source Selection. A best value-tradeoff source selection in Phase II will include Price as a factor. Evaluation of Phase II proposals will result in multiple IDIQ contract awards to the five (5) to seven (7) best-value offers per region, and one Task Order Award to the single best value offeror overall. If a real-life seed task order project is not available at the time of Phase II Solicitation, then a mock task order will be used as a measure of competition. See attached RFP document and RFP attachments for details. Questions regarding the Phase I submission may be submitted via email to the Contracting Officers Amanda Mobley (almobley@fbi.gov), Eric Thomas (ejthomas3@fbi.gov), and Contract Specialist Ezekiel Galyon (ecgalyon@fbi.gov) on or before May 22, 2025. Any responses provided by the FBI will be posted on SAM.gov as an Amendment to the Solicitation. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Military

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
466
Active Projects
198
Bidding Soon
2,770
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 24, 2025

Project location map

Multiple Locations, Washington, DC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.