Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 28, 2025 at 8:00 PM
Updated July 29, 2025
Site work and new construction of a water / sewer project in Albuquerque, New Mexico. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
As of July 28, 2025, this project has not yet been awarded. The project is expected to be awarded on October 25th, 2025. Reference Number 0000386370 Question Deadline 06/10/2025 at 1:15 PM MT Questions are submitted online Yes Armida Magallanes Purchasing Administrator, Central Purchasing Office Albuquerque Bernalillo County Water Utility Authority PO Box 568 Albuquerque NM 87103 Phone: 505-289-3272 Cell: 505-433-8727 Email: amagallanes@abcwua.org As part of the Water Authority's 100-year water management strategy document, Water 2120: Security Our Water Future plan, the Water Authority identified the need for future reuse water sources and associated infrastructure located in the Westside service area. Additionally, as part of the latest Infrastructure Improvements Planning, the Corrales interceptor (aka Westside interceptor) and Riverside drain interceptor (aka Corrales Trunk) were highlighted as critical capacity-restricted sanitary sewer collection infrastructure serving the Westside service area. In addition to the existing and projected collection system flows associated with the system, the industrial user (Intel) has indicated plans to discharge up to 7.25 million gallons per day (mgd) at buildout into the Corrales Interceptor, which then flows to the Westside Interceptor. This flow from Intel will further stress the existing collection system and infrastructure. The purpose of this Project is to construct Phase 1 of the overall project, which provides a new treatment and reclamation facility to provide capacity relief for the collection system due to anticipated future limitations, outfall and vegetated conveyance to the Rio Grande, and to provide provisions for future non-potable reuse distribution for the Water Authority's customers in the Westside service area for turf irrigation and limited other uses, including industrial.
Final Planning
Water / Sewer
$500,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2025
October 8, 2025
5600 Mirandela St NW, Albuquerque, NM
Related To This Project
Albuquerque, NM
Bid Date: May 30 2025
Albuquerque, NM
Bid Date: May 19 2025
Albuquerque, NM
--
Albuquerque, NM
--
Albuquerque, NM
--
Albuquerque, NM
Bid Date: May 23 2025
Albuquerque, NM
--
Albuquerque, NM
Bid Date: Jun 23 2025
Albuquerque, NM
Bid Date: May 30 2025
Albuquerque, NM
Bid Date: May 27 2025
Albuquerque, NM
Bid Date: May 21 2025
Albuquerque, NM
Bid Date: May 22 2025
Albuquerque, NM
Bid Date: Jun 03 2025
Albuquerque, NM
Bid Date: Feb 23 2021
Albuquerque, NM
Bid Date: Dec 11 2017
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
