BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated July 29, 2025

Site work and new construction of a water / sewer project in Albuquerque, New Mexico. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

As of July 28, 2025, this project has not yet been awarded. The project is expected to be awarded on October 25th, 2025. Reference Number 0000386370 Question Deadline 06/10/2025 at 1:15 PM MT Questions are submitted online Yes Armida Magallanes Purchasing Administrator, Central Purchasing Office Albuquerque Bernalillo County Water Utility Authority PO Box 568 Albuquerque NM 87103 Phone: 505-289-3272 Cell: 505-433-8727 Email: amagallanes@abcwua.org As part of the Water Authority's 100-year water management strategy document, Water 2120: Security Our Water Future plan, the Water Authority identified the need for future reuse water sources and associated infrastructure located in the Westside service area. Additionally, as part of the latest Infrastructure Improvements Planning, the Corrales interceptor (aka Westside interceptor) and Riverside drain interceptor (aka Corrales Trunk) were highlighted as critical capacity-restricted sanitary sewer collection infrastructure serving the Westside service area. In addition to the existing and projected collection system flows associated with the system, the industrial user (Intel) has indicated plans to discharge up to 7.25 million gallons per day (mgd) at buildout into the Corrales Interceptor, which then flows to the Westside Interceptor. This flow from Intel will further stress the existing collection system and infrastructure. The purpose of this Project is to construct Phase 1 of the overall project, which provides a new treatment and reclamation facility to provide capacity relief for the collection system due to anticipated future limitations, outfall and vegetated conveyance to the Rio Grande, and to provide provisions for future non-potable reuse distribution for the Water Authority's customers in the Westside service area for turf irrigation and limited other uses, including industrial.

Final Planning

Water / Sewer

$500,000.00

Public - City

New Construction, Site Work

5

13

4

6

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
25
Bidding Soon
328
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

October 8, 2025

Project location map

5600 Mirandela St NW, Albuquerque, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.