Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 3, 2021 at 8:00 PM
Updated May 7, 2025
Site work for a museum in Albuquerque, New Mexico. Completed plans call for site work for a museum.
As of April 5 2021 project was not yet been awarded. No estimated time frame yet. The new Asia Exhibit is going to be an exciting addition to the ABQ BioPark, featuring five different animal species, and offering enhanced views into the existing Elephant Exhibit. This continent-wide species collection showcases: Orangutans, Siamangs, Malayan Tigers, Snow Leopards, and Steller's Sea Eagles. The 4.5 acre +/- project site is divided into four distinct landscape and theming zones: Village, Rainforest, Mountain, and Coastal. The Village acts as the gateway to the exhibit and will include auxiliary visitor comfort facilities. Structures within this zone will be themed resembling a rural southeast Asian village. The Rainforest will feature highly unique interconnected habitats. These netted exhibits will allow the animals to use the outdoor yards and habitat corridors in engaging and enriching fashion. The Rainforest will be heavily planted to emulate the southeast Asian jungle. The Mountain and Coastal zones will be considerably more rocky and will require detailed craftsmanship from an experienced exhibit contractor. Tiger and Steller's Sea Eagle exhibits will incorporate larger bodies of water, both requiring Life Support Systems, while numerous smaller yards are slated to have fill and dump pools. Given the flatness of the existing site, there will be considerable berming around the perimeter of the exhibit to create a self-contained world-class exhibit. An external gravel ring road is incorporated to allow for easy service and maintenance access to all major buildings and exhibit yards. Internal visitor pathways are sized for both the comfort of the guests and the additional service vehicle access to the exhibits. There will be several small to mid-size climate-controlled buildings on the project, including: Restrooms (1,250 SF), Primate Holding (3,400 SF), Feline Holding (3,700 SF), Steller's Sea Eagle Holding (800 SF), and Elephant Viewing Service Building (450 SF). The two Life Support Systems buildings (combined 1,200 SF), Elephant Viewing Pavilion (1,700 SF), and several storage and educational structures (combined 1,500 SF) are not going to be air conditioned. Numbers in parenthesis indicate the approximate areas of those structures. In addition to the expected animal caging systems, some of the unique features incorporated in the holding buildings include heated floor slabs, bio flooring, exhibit glazing, and climbing and enrichment structures. This project will consist of two phases, as described on G-004 of the Contract Documents.
Award
Museum
$27,622,688.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2021
July 1, 2021
903 10th St SW, Albuquerque, NM
Related To This Project
Albuquerque, NM
Bid Date: Jun 03 2025
Albuquerque, NM
Bid Date: May 22 2025
Albuquerque, NM
Bid Date: May 21 2025
Albuquerque, NM
Bid Date: May 27 2025
Albuquerque, NM
Bid Date: May 30 2025
Albuquerque, NM
Bid Date: Jun 10 2025
Albuquerque, NM
Bid Date: May 30 2025
Albuquerque, NM
Bid Date: May 19 2025
Albuquerque, NM
Bid Date: Dec 11 2017
Southwestern Indian Polytechnic Institute (SIPI) Library Design Build Construction Project - 5779708
Albuquerque, NM
Bid Date: May 15 2025
Albuquerque, NM
Bid Date: May 19 2025
Albuquerque, NM
Bid Date: May 20 2025
Albuquerque, NM
--
Albuquerque, NM
Bid Date: Jul 23 2025
Albuquerque, NM
Bid Date: May 21 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
