BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2025 at 8:00 PM

Updated September 19, 2025

Site work for a water / sewer project in Buellton, California. Working plans call for site work for a water / sewer project.

**As of September 18th, 2025, no bids received. No definite date for the rebid.** : The WORK includes maintenance on an existing buried steel potable water pipeline in below grade vaults and above ground air release valves. Areas where work on the pipeline is required are in both buried concrete vaults and small above-grade riser cans. Work in the vaults will be under the Contractor's confined space permit. Services required include: coating removal, surface preparation and application, welding, minor excavation and backfill, removal and replacement of air and vacuum valves and piping (ranging in size from 3" to 12"), isolation valves assemblies and replacement of 24" manways along with minor concrete removals and replacement, and all other WORK required in accordance with the Contract Documents. : The site of the WORK is located in Buellton, CA and extends from approximately 12 miles west of Highway 101 to approximately 7 miles east of Highway 101 and is adjacent to Highway 246. The work areas are accessible via paved and dirt access roads and within CCWA's existing easement. The WORK must be completed within thirty-seven (37) working days after the commencement date stated in the Notice to Proceed, which is scheduled to be issued on October 3, 2025. WORK on the pipeline must be conducted during the 2025 Coastal Branch outage, which is scheduled to begin on Monday, October 27, 2025 and end on Friday, November 7, 2025. The bid must be submitted on the forms provided and must be accompanied by a bid guarantee. The bid guarantee must be in the form of a certified check, cashier's check, or bid bond, which serves as a guarantee that the bidder will, if successful, promptly comply with the Instructions to Bidders and execute the Agreement and furnish bonds as required by the specifications. The bid guarantee shall not be less than ten percent (10%) of the total amount of the bid and shall be payable to the Central Coast Water Authority. Certified checks submitted by the recipient of the Notice of Award will be deposited when received and refunded upon receipt of a Performance Bond and Payment Bond. A bid will not be considered unless one of the allowed forms of Bidder's Security is enclosed with it. Present to Conduct a Tour of the Site and Facilities and Answer Questions.

Final Planning

Water / Sewer

$231,000.00

Public - State/Provincial

Site Work

9

12

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
19
Bidding Soon
590
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.