BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2025 at 8:00 PM

Updated August 16, 2025

This is a service / maintenance or supply contract in Harlingen, Texas. Contact the soliciting agency for additional information.

Water Purification Apparatus and Treatments, For Distilled, Reagent Water, etc. 67086 Water Filtration, Conditioning, and Purification Equipment for the Office and Home 89015 Complete Water Treatment Systems, Chemical 89016 Complete Water Treatment Systems, Nonchemical: Ultraviolet Water Supply Sterilization, etc. 89020 Demineralizers: Reverse Osmosis, etc. 89024 Filtration Equipment, Water Including Parts and Accessories. Texas State Technical College ("TSTC") is a coeducational two-year institution of higher education offering courses of study in technical vocational education for which there is demand within the State of Texas. TSTC is mandated to contribute to the educational and economic development of the State of Texas by offering occupationally oriented programs with supporting academic course work, emphasizing highly specialized advanced and emerging technical and vocational areas for certificates or associate degrees. Our mission, "to place more Texans in great paying jobs," drives our institution. TSTC is pushing the boundaries in education, making outcomes the driving metric of success. We currently have 11 campuses across the state, with another new campus recently approved by the State Legislature that should be built and operating in the next few years. For more information about TSTC, go to website. The purpose of this Request for Proposal (RFP) is to solicit responses from qualified suppliers to provide, deliver, and support ten (10) complete whole house reverse osmosis (RO) water treatment systems with a daily output of 1800-2000 gallons per day (GPD). These systems will be used at the Texas State Technical College (TSTC) Harlingen campus to ensure high-quality water treatment for instructional and operational needs. Failure to submit a SIGNED Execution of Offer and HUB Subcontracting Plan could result in disqualification (please make sure forms are signed when document is uploaded). TSTC anticipates the contract to exceed $100,000 and will require that a HUB Subcontracting Plan be submitted. In the case that a HUB Subcontracting Plan is required, suppliers are not required to meet the State of Texas HUB goals. However, TSTC requires that all suppliers make a good faith effort in achieving those goals.

Award

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
30
Bidding Soon
387
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

June 30, 2025

Project location map

1902 N Loop 499, Harlingen, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.