Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 4, 2025 at 8:00 PM
Updated September 5, 2025
Site work and paving for a road / highway in Seattle, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Stride Bus Rapid Transit , BT307 - Kenmore/Bothell, SR 522 Roadwork & Stations ENGINEER'S ESTIMATE: $43,500,000 - $50,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Small Business Goal is 5% DBE Goal is 0% BT307 - Bothell/Kenmore SR 522 Roadway & Stations project ("Project") is part of Sound Transit's new Stride Bus Rapid Transit program ("Stride BRT") and includes improvements for the Stride BRT S3 Line in the City of Kenmore and the City of Bothell. Within Kenmore the Project will include the following: six station platforms along SR 522 with associated paving, curbs, sidewalks, structural foundations, and utilities, and transit signal priority equipment to the existing traffic signals at intersections along SR 522. In Bothell the Project will include the following: eight station platforms on city streets similar to the platforms in Kenmore, transit signal priority equipment to the existing traffic signals along the route, new traffic signals at two intersections on NE 185th St, a new mid-block signalized crosswalk across Beardslee Blvd near UW Bothell/Cascadia College, and additional sidewalk improvements. A new center queue bypass lane will be installed in Bothell on SR 522, including soldier pile and tie back retaining walls, underground electric duct banks, sidewalks, and other utility improvements. The Project in both cities also includes paving, landscaping restoration, relocation of existing utilities, improvements to the existing stormwater management systems, and removing and disposing of any contaminated substances encountered. RFIs must be submitted by July 1, 2025.
Award
Roads / Highways
$44,579,472.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 30, 2025
October 22, 2025
Multiple Locations, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Jun 10 2025
Seattle, WA
Bid Date: Jun 06 2025
Seattle, WA
--
Seattle, WA
Bid Date: Jun 06 2025
Seattle, WA
Bid Date: Jun 02 2025
Seattle, WA
Bid Date: Jun 04 2025
Seattle, WA
Bid Date: Jun 04 2025
Seattle, WA
--
Seattle, WA
Bid Date: Jun 06 2025
Seattle, WA
Bid Date: Jun 04 2025
Seattle, WA
Bid Date: May 29 2025
Seattle, WA
Bid Date: May 14 2025
Seattle, WA
Bid Date: May 21 2025
Seattle, WA
Bid Date: May 21 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
