BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 10, 2025 at 8:00 PM

Updated September 30, 2025

Site work and paving for a civil project in Covington, Georgia. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

“The owner has determined a prequalified list of construction managers. The Project is expected to be awarded on July 21st 2025** ” Question Deadline 05/27/2025 All questions or comments should be directed to the Owner Contact as follows: Mike Willis, CPESC City, Engineering Manager 2194 Emory Street Covington, GA 30016 Email: mwillis@cityofcovington.org Issues Response to Questions by: May 30, 2025 Scope of Work The Construction Manager at Risk (CMAR) will be responsible for Phase I Pre-Construction and Phase II Construction Services for the scope listed below. The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, testing, startup, and other costs and effort required to complete the following: Removal of approximately 108 linear feet of CMP and replacement with RCP, Installation of approximately 303 linear feet of 8" DIP gravity sewer, Installation of approximately 1,545 linear feet of slip lining existing sewer, Installation of approximately 940 linear feet of 6" DIP water main, Installation of approximately 1,705 linear feet of 8" DIP water main, Installation of approximately 500 linear feet of 10" DIP water main, Installation of approximately 4,672 linear feet of 2" PE gas main, Installation of approximately 547 linear feet of 3/4" PE gas main, Installation of approximately 4,430 linear feet of power/telecommunications duct bank, Removal and replacement of asphalt pavement Milling and 1.5" asphalt overlay with striping Project Location: The project area comprises a nine-block area that is centered on the downtown square. This area includes government and private commercial development. The downtown square area is a vibrant commercial district with numerous privately owned businesses that will benefit from the infrastructure improvements being constructed. The Contractor shall not unnecessarily disrupt operations of or access to local businesses during project construction. Any necessary disruptions will be coordinated with local businesses through the City's Project Manager. In general, businesses in the project area will be able to remain open and accessible during normal business hours throughout the project. The schedule for the project will be determined during Phase I Services between the CMAR and City. The time allotted for final completion of work shall not be more than 720 consecutive calendar days. The City of Covington reserves the right to reject any and all proposals

Final Planning

Roads / Highways

$9,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
153
Bidding Soon
1,966
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

August 1, 2025

Project location map

Multiple Locations, Covington, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.