BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2025 at 8:00 PM

Updated May 16, 2025

This is a service / maintenance or supply contract in Ottawa, Ontario. Contact the soliciting agency for additional information.

Reference Number 0000293476 Question Acceptance Deadline 2025/05/28 03:00:00 PM EDT Purpose of this project is to provide commissioning services from design through to the end of warranty period. This includes, but not limited to, the following: Design Review Development of the Commissioning Plan Development of the Commissioning Specifications Shop Drawing Review Development of the Pre-functional and Functional Testing checklist Periodic Site reviews Develop and maintain a Master Issues Log and Testing Record Witnessing of testing Organizing and Chair Commissioning Meetings Perform and document functional testing and performance verification Provide all commissioning documentation Act as the CAN/ULC S1001 Integrated System Coordinator Attend and Record all Training sessions Seasonal testing The process of Commissioning involves the cooperation of the University of Ottawa, the Owner's. PM, the GC, the Prime and the Design Team, and other independently appointed consultants. The University of Ottawa has adopted a holistic commissioning process not only as its quality assurance program to plan, design, construct and operate this facility. The Commissioning Process provides tools to enable everyone involved in the projects to verify that the final facility meets the Owner's Project Requirements. The CSP will work independently with the University of Ottawa. The CSP with assistance of the University of Ottawa, Owner PM, GC, Prime and Design Team will review and update the Owner's Project of Requirements as the project progresses. The CSP is free to suggest any improvements for consideration by the University of Ottawa. For the purpose of this proposal Commissioning Process is encompassed of four stages as follows: Commissioning Process Pre-Design Phase Commissioning Process - Design Phase Commissioning Process Construction Phase Commissioning Process - Handover and Warranty Period The objective of commissioning is to provide documented confirmation that a facility fulfills the functional and performance requirements of the University of Ottawa's occupants and operators. To achieve this goal, it is necessary to verify and document the University of Ottawa's Owner's Statement of Requirements for system function, performance, and maintainability; as well as, to verify and document compliance with these criteria throughout pre-design, design, construction, start-up, and the initial period of operation through the commissioning process. In addition, complete Commissioning Operation and Maintenance (O&M) manuals, as well as training on system operation, should be provided to the building operators to ensure the building continues to operate as intended. The CSP will plan, manage, perform, and report on the commissioning activities, utilizing the reporting formats and standardized forms provided by the CSP. The CSP will submit deliverables to University of Ottawa according to a project schedule set by CSP and agreed upon by the University of Ottawa, PM, and GC. It is extremely important that all commissioning tasks be conducted in a transparent and timely manner and involve the PM, GC, and other University of Ottawa stakeholders to the greatest degree possible. The CSP will be involved throughout the project from the design stage through to the end of warranty period. The primary role of the CSP during the overall these phases is to develop Owner's Project Requirement (OPR), detailed commissioning specifications, an initial commissioning plan, and review design documents to validate it meets the University of Ottawa's Owner's Statement of Requirements (OSR). During construction, the CSP chairs the commissioning meetings, develops and coordinates the execution of a testing plan, which includes observing and documenting system performance to ensure that systems are functioning in accordance with the Cx Teams design and Owner's Statement of Requirements and the contract documents. During the warranty period, the CSP will coordinate seasonal testing, develop a preventative maintenance plan, and review building operations with facilities staff to identify and troubleshoot any known. issues. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Educational

$30,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
117
Bidding Soon
1,141
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

Project location map

75 Laurier Ave E, Ottawa, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.