BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated November 18, 2025

Site work and paving for a mixed-use development in Newnan, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

https://www.times-herald.com/news/new-roundabout-planned-for-newnan-crossing-boulevard/article_7700f839-5413-440a-8275-d6f1b0ac31f2.html New roundabout planned for Newnan Crossing Boulevard There is a new roundabout in the works for Newnan Crossing Boulevard and Stillwood Drive in Newnan. The city is advertising for bids for the construction of a single-lane roundabout. Currently, traffic at the intersection is controlled by stop signs. "We are building a roundabout at this intersection to improve operations and safety," said Aimee Hayden, communications manager for the city. "There is an all-way stop control there now, and the roundabout will improve traffic flow, enhance safety and reduce delay." The Georgia Department of Transportation has been promoting roundabouts as an alternative to traffic lights to improve traffic flow and safety. On its website, it lists safety benefits of roundabouts, including reduced speeds and eliminating the potential for right-angle and head-on collisions. The city is taking bids through June 12, and the project is expected to start in August. "This roundabout will have three approaches initially, until such time the large tract of land abutting Poplar Road is developed," Hayden said. "That development will add a fourth approach." The project will be paid with special-purpose local-option sales tax revenue, Hayden said. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project Consists of constructing a single lane roundabout at the intersection of Newnan Crossing Blvd E and Stillwood Dr within the City Limits of Newnan, Georgia. Currently, vehicular traffic is controlled via stop signs. In addition to constructing the roundabout, modifications to the existing storm drainage system and adjacent sidewalks will be required. The project also involves relocation of water and sanitary sewer service lines as well as relocation of public utilities such as power, gas and phone. Question Deadline 06/05/2025: All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing via Email Communication to Michael Klahr, P.E. and Cary Dial, P.E

Award

Roads / Highways

$1,451,207.00

Public - City

Paving, Site Work

48

18

2

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
172
Bidding Soon
2,283
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

August 11, 2025

Project location map

Multiple Locations, Newnan, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.