BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2025 at 8:00 PM

Updated March 31, 2026

Site work for a water / sewer project in Iroquois, South Dakota. Completed plans call for site work for a water / sewer project.

The Bidder to whom the contract is awarded will be required to furnish a construction performance bond and a construction payment bond to the Owner in the amount of one hundred percent (100%) of the contract award for each bond, in conformance with the requirements of the Contract Documents. The construction performance bond and construction payment bond shall remain in full force until the completion of the Contract as specified in the General Conditions. The low responsive bidder will be required to certify to compliance with the American Iron and Steel provision of the Consolidated Appropriations Act of 2014. This certification form may be found on page AIS-21 of the State Revolving Fund (SRF) General Conditions and must be included in the bid proposal. Please be advised that waivers and exemptions from the American Iron and Steel provision that cite International Trade Agreements DO NOT comply with the Consolidated Appropriations Act of 2014 as it applies to the SRF programs. Claims from suppliers that the American Iron and Steel provision does not apply to certain products based on the International Trade Agreement exemptions of the Consolidated Appropriations Act of 2014 will not be accepted. All bids must be accompanied by a Bid security. Bid security will take the form of a bid bond in an amount of ten percent (10%) of the Bidder's maximum Bid price or a cashier's or certified check made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid price. The Bid security will be retained by the Owner as liquidated damages if the successful bidder refuses or fails to enter into an Agreement within fifteen (15) days after Notice of Award or fails at time of executing the contract to furnish a construction performance bond and construction payment bond guaranteeing the faithful performance of the work. The Owner reserves the right to reject any or all bids. NONDISCRIMINATION IN EMPLOYMENT (a) Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138 (WBE). The goals and other requirements for Bidders and Contractors under this regulation which concerns utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Women's Business Enterprises (WBE) are explained in the Specifications. The MBE goal for this project is 1.5% of the total dollar value of the job while the WBE goal is 2.4% of the total dollar value of the job. (b) Bidders on this work will be required to comply with the President's Executive Orders Nos. 11246 (Equal Employment) as amended, 11518 (Small Business Concerns), and 11625 (MBE) as amended. The requirements for Bidders and Contractors under these orders are explained in the Specifications. (c) The goal for female utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 6.9%. The goal for disadvantaged/minority utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 0.8%. The goals are applicable to the Contractor's aggregate on-site construction workforce whether or not part of that workforce is performing work on a federal and federally assisted contract or subcontract. Payment for all work shall be in cash based on monthly estimates. o Furnish and Install New Submersible Lift Station, including 2 pumps, piping, wetwell, valve vault, and all appurtenant equipment; o Furnish and Install approximately 2,080 LF of buried sanitary sewer 6-inch forcemain piping, including 750 ft of horizontal directionally drilled piping; o Furnish and Install approximately 30 LF of buried gravity sanitary sewer piping and 2 Sanitary Sewer Manholes; o Coredrill into existing Pond Influent Structure for New Forcemain; o All other miscellaneous work required not herein mentioned but inferred from the construction contract documents. Est. Value Notes: $1,300,000 to $1,700,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$804,734.00

Public - City

Site Work

56

26

36

5

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
264
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2025

August 4, 2025

Project location map

Multiple Locations, Iroquois, SD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.