Site work for a water / sewer project in Grand Junction, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000387162 Bid Intent Not Available The City of Grand Junction is soliciting competitive bids from qualified and interested Contractors for all labor, equipment, and materials required for Sanitary Sewer Cure-in-Place-Pipe Lining Project. All dimensions and Scope of Work shall be verified by Contractors prior to submission of bids. Question Deadline 05/27/2025 at 5:00 PM MT Questions are submitted online No, This Invitation for Bid (IFB) is issued by the City of Grand Junction. All contact regarding this IFB is to be directed to: Dolly Daniels; Purchasing Agent dollyd@gjcity.org Buyer Preferences, Guidelines & Requirements General Requirements - Bidder Prequalification/Preregistration Required - Bid Deposit Required - FOB Pre-Paid - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % This Project includes installing cast-in-place-pipe liner in many locations as shown on the Plan Set within the existing in-use sanitary sewer system. An estimation of 15,750 linear feet of sewer main will be lined. There are many locations around the city where this work will occur. Removal of manhole lids, rings and cones will be required. Backfill, road base and hot asphalt paving will be required in the locations where it was removed. Traffic control and sequence of construction will be presented to the city in a scheduled format. All effluent from the curing process will be captured by the contractor. Any byproduct of the curing process will be captured by the contractor. All bypass pumping plans will be presented to the City and will show methods for monitoring and must be manned continuously, 24 hours a day, 7 days a week while bypassing is in operation. Remote monitoring will not be an acceptable alternative. A contingent plan for bypass pumping failure will be made and agreed to before any bypass pumping is started. When no longer needed the method of removal of bypass pumping will be presented to the City and once approved will be allowed to turn off pumping and removed. No raw sewer will be allowed to be discharged to the ground of any amount.

Award

Water / Sewer

$2,279,871.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
20
Bidding Soon
145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

July 4, 2025

Project location map

To Be Determined, Grand Junction, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.