Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 3, 2025 at 8:00 PM
Updated July 4, 2025
This is a service / maintenance or supply contract in St Petersburg, Florida. Contact the soliciting agency for additional information.
The City of St. Petersburg, Florida ("City") is seeking the services of a qualified Architectural/Engineering ("A/E") firms to provide facility planning and implementation services for the Northwest Water Reclamation Facility ("NWWRF"), located at 7500 26th Ave N, St. Petersburg, FL 33710. 1.2. Background The NWWRF was originally constructed in 1957 and has been upgraded and expanded several times. The facility has a permitted capacity of 20 million gallons per day (MGD) annual average daily flow (AADF). This is a Type 1 complete mixed activated sludge domestic wastewater treatment facility, which includes: headworks with course and fine screening and two grit removal units; two rectangular aeration basins with a total aeration volume of approximately 4.36 million gallons (MG); four final clarifiers of 5.03 MG total volume; six automatic backwash shallow bed traveling bridge filters and three tertiary disc filters; and a dual channel chlorine contact chamber of 0.470 MG total volume. Disinfection is provided by liquid sodium hypochlorite solution. Up to 20 MGD AADF of treated effluent (reclaimed water) is transferred to the City of St. Petersburg Master Reuse system or into underground injection wells. Wastewater residuals are pumped to the Southwest Water Reclamation Facility. The intent of this project is to select a single A/E team to begin implementation of the St. Pete Water Plan's (formerly known as the Integrated Water Resources Master Plan) recommendations for improving the City's wastewater infrastructure, specifically at the NWWRF to meet future needs, including supporting projects. The specific recommendations for the NWWRF that need to be evaluated in more detail include: Replacing aging assets and outdated technology no longer supported by the manufacturer; Increasing hydraulic and treatment capacity, which may also include assessing additional wet weather flows diverted from adjacent sewer basins; Reducing nutrients in plant effluent; Increasing resiliency; Addressing climate risks and natural hazards; and Complying with regulatory requirements, including the potential for more stringent water quality criteria in the future. The initial work with include planning, prioritizing, and phasing of individual projects. This work may include evaluation of the current capacity. Upon approval of the Facility Plan basis of design report, the A/E may be asked to provide design and construction administration services for the development and construction of any portion of the plan. Jacobs Engineering, Inc. completed several technical evaluations in conjunction with the St. Pete Water Plan development process, which included the following: Process-by-process evaluations Major assets condition assessments Buildings and structures condition assessment Asset management renewal and replacement model Site resilience assessment Future nutrient removal treatment scenarios The resulting renewal and replacement ("R&R") model considered the condition, life cycle, replacement value, and renewal frequency of each asset. The R&R model generated a list of prioritized asset management needs for the NWWRF major assets. The recommendations included modifying the treatment process to advanced wastewater treatment standards. All questions must be submitted via City's online sourcing system's Question & Answer feature no later than 12:00 pm on Thursday, June 5, 2025. The Evaluation Committee Meeting for selections has been rescheduled for: July 18, 2025, 10:10am, at 1 4th St N, Saint Petersburg, FL 33701, Conference Room 800.
Conceptual
Water / Sewer
Public - City
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 17, 2026
7500 26th Ave N, St Petersburg, FL
Related To This Project
St Petersburg, FL
Bid Date: Aug 05 2025
St Petersburg, FL
Bid Date: Jun 11 2025
St Petersburg, FL
Bid Date: Jun 05 2025
St Petersburg, FL
Bid Date: Jul 01 2025
St Petersburg, FL
Bid Date: Jun 26 2025
St Petersburg, FL
Bid Date: Jul 01 2025
St Petersburg, FL
Bid Date: Jul 03 2025
St Petersburg, FL
Bid Date: Jun 12 2025
St Petersburg, FL
Bid Date: May 27 2025
St Petersburg, FL
Bid Date: Jun 20 2025
St Petersburg, FL
Bid Date: Jun 10 2025
St Petersburg, FL
Bid Date: May 22 2025
St Petersburg, FL
Bid Date: May 23 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
