EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 27, 2025 at 8:00 PM

Updated June 28, 2025

Renovation of a military facility in Gillett, Arkansas. Completed plans call for the renovation of a military facility.

The National Park Service, Contracting Operations Central, intends to issue a Request for Quote (RFQ) for the Replace DP-2 Panel and Restore Power project for Arkansas Post National Monument in Gillette, AR. Work consists of: The disconnection and removal of existing distribution panel DP-2 which is fed direct from the main distribution panel (MDP) and located within the mechanical room of the visitor center (VC). The contractor shall provide and install a new NEMA 3R rated enclosure to house a new single phase, 800amp, 240v panel. Existing electrical service from panel DP-2 which is routed by conduit up through the floor of the mechanical room shall be extended through the wall and re-connected to the new panel DP-2 as indicated in the ion drawings. NUMBER: 140P6025Q0040 PROJECT MAGNITUDE: Between 100,000 and 250,000 TYPE OF CONTRACT: This will be a firm-fixed price contract expected to be awarded to a prime contractor by Summer 2025 with to begin in Summer 2025. ion Wage Rate Requirements for Arkansas County, AR will apply. EVALUATION FACTORS: Technical, Past , and Price North American Industry Classification System (NAICS) CODE CLASSIFICATION and SET ASIDE: The NAICS Code is 238210, and the size standard is 19 million. This project is set aside 100 for Total Small Businesses. : A date, time, and meeting will be announced in the . Offerors are highly encouraged to attend the scheduled to inspect the site and to ensure they fully understand the requirement and conditions that may affect the cost of the project, specifications, and . PUBLICIZING: The official and its attachments will be issued and available June 2025 and will be posted to the Contract Opportunities/SAM.gov website at https://sam.gov/content/opportunities . The contracting office will not provide hardcopies or copies of the . REGISTRATIONS: In order to be awarded a contract, an offeror must have an UEI number. Also, the offeror must be registered and active in the System for Award Management (SAM), website at http://www.sam.gov, and have completed their Online Representations and Certifications at the time of the close date once the is posted. POINT OF CONTACT: Bridget Parizek, Contracting Officer, bridget_parizeknps.gov, 402-800-7927. : All shall be submitted in writing to bridget_parizeknps.gov. All must be submitted in writing no later than June 17, 2025. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project work consists of: The disconnection and removal of existing distribution panel DP-2 which is fed direct from the main distribution panel (MDP) and located within the mechanical room of the visitor center (VC). The contractor shall provide and install a new NEMA 3R rated enclosure to house a new single phase, 800amp, 240v panel. Existing electrical service from panel DP-2 which is routed by conduit up through the floor of the mechanical room shall be extended through the wall and re-connected to the new panel DP-2 as indicated in the ion drawings. The Contractor shall additionally identify the point of connection of electrical service from the VC fire alarm system located within the same mechanical room as panel DP-2 (approximately 8 feet away horizontally) and establish a direct wire route within conduit to new panel DP-2 and terminate at new dedicated circuits. As bid additive, should NPS elect to award, the Contractor shall restore electrical connection which serves a series of duplex receptacles which were severed within a single 1" galvanized conduit encapsulated within a CMU and Grout filled cavity of the exterior wall. The severed connection is due to installation of a new thru-wall mechanical louver under a separate contract. Work is to include core drill below the existing louver to intercept the conduit, install new wall mounted junction box(es), and route wiring in CO approved manner to establish restored connection to subpanel L-1 in adjacent room. See ion drawings for representative photos and further information. Additional requirements information is provided in the , specifications, supporting documents and other pertinent attachments.

Sub-Bidding

Military

$250,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 08 - Openings

Division 08 - Openings

Hardware
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Central Cooling Equipment
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
20
Bidding Soon
281
All Active Projects
131
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2025

August 6, 2025

img_map_placeholder

1741 Old Post Rd, Gillett, AR

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

ARPO - Replace DP-2 Panel and Restore Power

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.