Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 27, 2025 at 8:00 PM
Updated June 28, 2025
Renovation of a military facility in Gillett, Arkansas. Completed plans call for the renovation of a military facility.
The National Park Service, Contracting Operations Central, intends to issue a Request for Quote (RFQ) for the Replace DP-2 Panel and Restore Power project for Arkansas Post National Monument in Gillette, AR. Work consists of: The disconnection and removal of existing distribution panel DP-2 which is fed direct from the main distribution panel (MDP) and located within the mechanical room of the visitor center (VC). The contractor shall provide and install a new NEMA 3R rated enclosure to house a new single phase, 800amp, 240v panel. Existing electrical service from panel DP-2 which is routed by conduit up through the floor of the mechanical room shall be extended through the wall and re-connected to the new panel DP-2 as indicated in the ion drawings. NUMBER: 140P6025Q0040 PROJECT MAGNITUDE: Between 100,000 and 250,000 TYPE OF CONTRACT: This will be a firm-fixed price contract expected to be awarded to a prime contractor by Summer 2025 with to begin in Summer 2025. ion Wage Rate Requirements for Arkansas County, AR will apply. EVALUATION FACTORS: Technical, Past , and Price North American Industry Classification System (NAICS) CODE CLASSIFICATION and SET ASIDE: The NAICS Code is 238210, and the size standard is 19 million. This project is set aside 100 for Total Small Businesses. : A date, time, and meeting will be announced in the . Offerors are highly encouraged to attend the scheduled to inspect the site and to ensure they fully understand the requirement and conditions that may affect the cost of the project, specifications, and . PUBLICIZING: The official and its attachments will be issued and available June 2025 and will be posted to the Contract Opportunities/SAM.gov website at https://sam.gov/content/opportunities . The contracting office will not provide hardcopies or copies of the . REGISTRATIONS: In order to be awarded a contract, an offeror must have an UEI number. Also, the offeror must be registered and active in the System for Award Management (SAM), website at http://www.sam.gov, and have completed their Online Representations and Certifications at the time of the close date once the is posted. POINT OF CONTACT: Bridget Parizek, Contracting Officer, bridget_parizeknps.gov, 402-800-7927. : All shall be submitted in writing to bridget_parizeknps.gov. All must be submitted in writing no later than June 17, 2025. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project work consists of: The disconnection and removal of existing distribution panel DP-2 which is fed direct from the main distribution panel (MDP) and located within the mechanical room of the visitor center (VC). The contractor shall provide and install a new NEMA 3R rated enclosure to house a new single phase, 800amp, 240v panel. Existing electrical service from panel DP-2 which is routed by conduit up through the floor of the mechanical room shall be extended through the wall and re-connected to the new panel DP-2 as indicated in the ion drawings. The Contractor shall additionally identify the point of connection of electrical service from the VC fire alarm system located within the same mechanical room as panel DP-2 (approximately 8 feet away horizontally) and establish a direct wire route within conduit to new panel DP-2 and terminate at new dedicated circuits. As bid additive, should NPS elect to award, the Contractor shall restore electrical connection which serves a series of duplex receptacles which were severed within a single 1" galvanized conduit encapsulated within a CMU and Grout filled cavity of the exterior wall. The severed connection is due to installation of a new thru-wall mechanical louver under a separate contract. Work is to include core drill below the existing louver to intercept the conduit, install new wall mounted junction box(es), and route wiring in CO approved manner to establish restored connection to subpanel L-1 in adjacent room. See ion drawings for representative photos and further information. Additional requirements information is provided in the , specifications, supporting documents and other pertinent attachments.
Sub-Bidding
Military
$250,000.00
Public - Federal
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 08 - Openings
Division 23 - Heating Ventilating and Air Conditioning
Division 27 - Communications
Division 28 - Electronic Safety and Security
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 7, 2025
August 6, 2025
1741 Old Post Rd, Gillett, AR
Related To This Project
Gillett, AR
Bid Date: Jun 20 2025
Gillett, AR
Bid Date: Jan 08 2025
Gillett, AR
Bid Date: Jan 15 2025
Gillett, AR
Bid Date: Jul 06 2023
Gillett, AR
Bid Date: Jun 13 2023
Hot Springs National Park, AR
Bid Date: Jun 05 2025
Waldron, AR
Bid Date: May 27 2025
Springdale, AR
Bid Date: May 28 2025
Hot Springs National Park, AR
Bid Date: Jun 02 2025
Rogers, AR
Bid Date: May 27 2025
Jonesboro, AR
--
Jonesboro, AR
--
Siloam Springs, AR
Bid Date: May 14 2025
Harrison, AR
Bid Date: May 20 2025
Little Rock, AR
Bid Date: May 27 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.