Published June 24, 2025 at 8:00 PM

Updated June 25, 2025

Site work and paving for a sidewalk / parking lot in Clawson, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of June 20, 2025, the project was awarded to Golden Gate Construction LLC, with an awarded amount of $158,314.10. Reference Number 0000387363 This project includes the installation of concrete sidewalk in gap area where no sidewalk currently exists and the removal and replacement of existing sidewalk where deficencies have been noted throughout the City. This project includes the installation of concrete sidewalk in gap areas where no sidewalk currently exists as shown on the construction plans, and the removal and replacement of existing sidewalk where deficiencies have been noted throughout the City in the locations identified in the Sidewalk Repair Location Map. The approximate quantities for the major items of work involved in this project are as follows: Sidewalk, Rem 1,211 Syd Aggregate Base, 4 inch 728 Syd Sidewalk, Conc, 4 inch 14,078 Sft Sidewalk, Conc, 6 inch 810 Sft Sidewalk, Conc, 8 inch 1,747 Sft Curb Ramp, Conc, 4 inch 218 Sft Curb Ramp, Conc, 6 inch 381 Sft Question Deadline 05/28/2025 at 10:30 AM ET Questions are submitted online No , For Bidder Inquiries, please contact Jack E. Fox, P.E. by email at jfox@aewinc.com. All inquiries shall be in writing. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % A certified check, or the included Bid Bond, executed by the Bidder and a surety company, payable to the City of Clawson, in an amount at least equal to five percent (5%) of the bid, shall be submitted with each bid. No bid may be withdrawn for a period of sixty (60) calendar days after the receipt of bids. This time frame may be adjusted through mutual agreement between Owner and Contractor. *The City of Clawson will award the contract to the lowest responsible bidder; however, it reserves the right to accept any bid, reject any or all bids and to waive any irregularities in bidding. The successful bidder will be required to furnish satisfactory performance, maintenance and guarantee, labor, and material bonds and insurance certificates. It is anticipated that Consumers Energy will be performing work related to a gas main on the north side of Nakota Road between S. Crooks Road and S. Batchewana Avenue, with work scheduled to commence June 1, 2025 with an anticipated completion date of August 1, 2025. Work on the north side of Nakota Road between S. Crooks Road and S. Batchewana Avenue related to this project shall not commence until Consumers Energy has completed their work and has left the site on August 1, 2025, unless otherwise directed by the Engineer.

Award

Sidewalks / Parking Lot

$158,314.00

Public - City

Paving, Site Work

11

9

2

5

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
333
Active Projects
128
Bidding Soon
2,464
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

July 4, 2025

Project location map

Multiple Locations, Clawson, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.