BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2025 at 8:00 PM

Updated June 13, 2025

Renovation of a transportation facility in Centerville, Tennessee. Completed plans call for the renovation of a transportation facility.

Scope of work, contract time, and liquidated damages are as follows: Removal of damaged roof and wall panels; structural steel repairs and flashing replacements; installation of roof coating, wall panels, personnel and overhead doors, windows, gutters, and downspouts; upgrade of plumbing, mechanical, and electrical systems; surface preparation and painting of interior and exterior steel; remove and dispose of all debris off-site; and incidental work necessary to return the facility to full operational condition.

Post-Bid

Transportation Terminals

$1,870,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
76
Bidding Soon
1,242
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2025

August 11, 2025

Project location map

2650 Airport Rd, Centerville, TN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.