Site work and outdoor lighting for a playground / park / athletic field in Auburn, Alabama. Completed plans call for site work for a playground / park / athletic field.
Yarbrough Tennis Court Relight Project The Contractor Shall Be Responsible For Providing The Labor And Equipment To Install A Complete And Operational Lighting System As Provided By The City Of Auburn. The City Shall Furnish Musco s Tlc Led Lighting System. Guarantee Will Be Required With Each Bid As Follows: At Least Five Percent (Not To Exceed $10,000) Of The Amount Bid In The Form Of A Certified Or Cashier's Check Or Bid Bond Payable To The City Of Auburn, Alabama. The City Reserves The Right To Select The Lowest Responsible Bidder As The Best Interest Of The City May Require, To Award The Purchase Contract From Any Of The Bids, To Reject Any And All Bids, And To Waive Any Informalities In Bids Received. All construction, after Notice to Proceed, is to be started no earlier than August 4th and must be completed by August 29th. A. Contractor Responsibility: The successful contractor shall include in his install cost proposal to accept the delivery of the owner furnished Musco TLC LED technology fixtures. The contractor shall be responsible for not only accepting delivery but for also storing the materials in a safe environment until they are installed. Also, the contractor shall include in his install proposal the cost to demo the existing fixtures and store them on a site as designated by the owner including all labor, equipment and materials needed to install the owner furnished materials per the manufacturer recommended install requirements. To provide the contractor with details of the system to be installed a BOM is attached that shows what will be included in the owner furnished package, as well as scans and other documents. B. Electric Power Requirements for the Sports Lighting Equipment: Electric power: 277 Volt, 3 Phase C. Maximum total voltage drop: Voltage drop to the disconnect switch located on the poles shall not exceed three (3) percent of the rated voltage. D. System Design 1. The electrical system equipment shall consist of: a. Conductors and conduit from the main service transformer to the service entrance panel board. b. The service entrance panel board with appropriate individual circuit over-current protection. The panel board shall meet local and National Electrical Code (NEC) requirements for the size of the service, AIC rating, and the type of the environment to which it will be exposed. All feeder breakers shall be bolt on type. c. Conductors and conduit for the feeder circuit from the service entrance panel board (or from the contactor panel if applicable) to the safety disconnect mounted in the electrical enclosures. d. Grounding conductors and grounding methods for the following: (1) The main service entrance panel board. (per NEC or local codes) (2) The lighting contactor enclosures. (per NEC or local codes) (3) Each electrical component enclosures. (Equipment Grounding System) (per NEC or local codes) 2. Wiring shall be all copper wire and shall be installed in rigid galvanized steel conduit meeting the NEC and local electrical codes. Acceptable copper wire types need to comply with any local requirements but will be labeled either THHN or THWN. Conduit elbows located at the electrical panel shall be rigid galvanized steel.
Award
Playgrounds / Parks / Athletic Fields
$121,900.00
Public - City
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2025
August 4, 2025
777 Yarbrough Farms Blvd, Auburn, AL
Related To This Project
Auburn, AL
Bid Date: Sep 04 2025
Auburn, AL
Bid Date: May 11 2021
Auburn, AL
Bid Date: Jul 22 2025
Auburn, AL
Bid Date: Jul 03 2025
Auburn, AL
Bid Date: Jul 22 2025
Auburn, AL
Bid Date: Aug 05 2025
Auburn, AL
Bid Date: Aug 12 2025
Auburn, AL
Bid Date: May 20 2025
Auburn, AL
--
Auburn, AL
Bid Date: May 21 2025
Auburn, AL
Bid Date: May 01 2025
Auburn, AL
Bid Date: May 15 2025
Auburn, AL
Bid Date: May 22 2025
Auburn, AL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.