BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2025 at 8:00 PM

Updated July 16, 2025

Demolition, site work, new construction and renovation of a mixed-use development in Taft, Texas. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; playground / park / athletic field; and water / sewer project.

Taft Independent School District, Gignac Architects, and SpawGlass Contractors invites you to submit bid proposals for Phase 1 Demolition of the Taft ISD High School Project. This project scope includes Demolition of 6 buildings and a baseball field to prepare the site for construction of the new high school. Along with demolition, the scope also includes electrical, plumbing and utility isolation, refrigeration recapturing, SWPPP installation and limited Earthwork scopes. GENERAL SCOPE OF WORK. Unless expressly provided otherwise herein, Subcontractor shall provide all supervision, labor, materials, supplies, equipment, tools, shop and working drawings, and permits to complete Subcontractor's Work, including without limitation all work described in the applicable portions of the Drawings and Specifications or reasonably inferable therefrom or typically performed by Subcontractors trade. Subcontractor shall begin, carry on and complete Subcontractor's Work in a skillful, prompt and diligent manner so as not to interfere with or delay the work of Contractor or the work of any other subcontractor. A. Description of Work: Turnkey Demolition B. F.O.B. jobsite. C. All applicable taxes and permits. D. Work in accordance with all provisions of this Subcontract, Exhibits, Contract Documents and any other documents incorporated by reference within this Subcontract. E. Work described in: F. Division 01 - General Requirements - As it pertains to this scope of work. G. Division 02 - Existing Conditions - As it pertains to this scope of work. H. Div 03-33 - As it pertains to this scope of work. I. Contract Drawings dated May 15th ,2025, and all associated addendum, RFI responses, Supplemental bid documents provided. J. All applicable taxes permits and fees. K. Taft ISD Prevailing Wage Rates L. Certified Payroll to be submitted to SpawGlass on a weekly basis. M. Updated Red Lines/As-Builts to be submitted to SpawGlass on a monthly basis. N. Move-Ins / Mobilizations required for this scope of work. O. Project Phasing Requirements to meet the project schedule. P. All lifting and hoisting equipment needed to perform the work.

Post-Bid

Educational

$350,000.00

Public - City

Demolition, New Construction, Renovation, Site Work

6

11

3

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
9
Bidding Soon
406
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2025

July 7, 2025

Project location map

727 McIntyre Ave, Taft, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.