Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 17, 2025 at 8:00 PM
Updated July 18, 2025
Site work for a water / sewer project in Stockton, California. Completed plans call for site work for a water / sewer project.
The East Complex Phase 1 Sewer Improvements project consists of significant upgrades to existing sewer infrastructure within the Port of Stockton. The scope includes the installation of approximately 966 linear feet of 15-inch and 482 linear feet of 18-inch sewer pipe at depths ranging from 9 to 12 feet below ground, in areas with existing groundwater presence. The work also includes the trenchless rehabilitation of 489 linear feet of existing sewer using cured-in-place pipe (CIPP) methods. The project will construct four new manholes ranging in depth from 12 to 14 feet and will abandon an existing 12 inch sewer line by grouting in place, in accordance with Union Pacific Railroad (UPRR) requirements. Additionally, the project includes the replacement of 12 linear feet of 18-inch sewer pipe located just north of the BNSF Mainline easement, at an approximate depth of 15 feet in ground water. Supporting work includes erosion and sediment control, traffic control implementation (including approved traffic management plans), and the installation of 1,500 linear feet of safety fencing adjacent to the rail corridor. All work will take place within the Port of Stockton's right-of-way on Road "L," between Road 21 and Road 23, in the East Complex or on BNSF main line easement. Contractor shall achieve Final Completion of the entire Work within fifty (50) working days from the date when the Contract Time commences to run.
Award
Water / Sewer
$1,157,546.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2025
September 1, 2025
Multiple Locations, Stockton, CA
Related To This Project
Stockton, CA
Bid Date: Jun 16 2025
Stockton, CA
--
Stockton, CA
Bid Date: Jun 20 2025
Stockton, CA
Bid Date: Jun 06 2025
Stockton, CA
Bid Date: Aug 28 2025
Stockton, CA
Bid Date: Jun 24 2025
Stockton, CA
Bid Date: Jun 04 2025
Stockton, CA
Bid Date: Jul 03 2025
Stockton, CA
Bid Date: Jun 13 2025
Stockton, CA
Bid Date: Jun 13 2025
Stockton, CA
Bid Date: Jun 05 2025
Stockton, CA
Bid Date: Jun 12 2025
Stockton, CA
Bid Date: May 30 2025
Stockton, CA
Bid Date: May 29 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed