Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 16, 2025 at 8:00 PM
Updated July 18, 2025
Site work and paving for a road / highway in Victoria, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
** As of July 16, 2025, project was awarded to CK Newberry, LLC. - Kenedy, with an awarded amount of $1,485,970.00 ** Reference Number 0000387602 Question Deadline 06/06/2025 at 12:00 PM CT Questions are submitted online Yes Participation Requirements - Airport Concessionaires Disadvantaged Business Enterprise (ACDBE) - Business Concern - Disadvantaged Business Enterprise (DBE) - Minority Business Participation - Native American Participation - Small Business Participation - Service-Disabled Veteran Owned - Women-Owned Business Participation General Requirement - Bid Deposit Required - Insurance Required - Prevailing Wage Required Bid Bond - 5 % - Performance Bond - 100 % - Payment Bond - 100 % Each Proposal must be accompanied by a certified check, cashier's check, or an approved Bid Bond in the amount of 5% of the Proposal cost, payable to the City of Victoria without recourse, as a guarantee the Respondent will enter into a contract and execute 100% performance and payment bonds on the forms provided, within ten (10) days after the contract has been awarded. The proposed budget for construction costs for this Project is $1,800,000.00, inclusive of all incidental and contingent expenses associated with the construction of the entire scope of the Project. The Proposer shall submit the proposed duration of the construction period in calender days. The projected substantial completion date will be the proposed number of calender days after the start of the construction activities. The start of construction activities is defined as 10 days after the date of the Notice of Proceed letter. The City reserves the right to modify the commencement date, subject to Owner and Contractor availability, phase the construction of the Project, or modify the schedule as needed and determined by the City due to modifications in scope. The City anticipates the scope of work to consist of the following responsibilities and the following items will be included in the scope of the VINE STREET REHABILITATION - FROM RED RIVER ST TOP MOCKINGBIRD LANE ; - Rehabilitation of the roadway excavating existing base material, lime stabilizing the subgrade, geo-grid, limestone base, seal coat and HMAC overlay from McCright St. to Mockingbird Ln. - Overlay existing asphalt from McCright St. to Red River Lane with 2 HMAC. - All other appurtenances necessary to complete the Project.
Award
Roads / Highways
$1,485,970.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
August 11, 2025
N Vine St, Victoria, TX
Related To This Project
Victoria, TX
Bid Date: Jun 20 2025
Victoria, TX
Bid Date: Jun 20 2025
Victoria, TX
Bid Date: Jun 18 2025
Victoria, TX
Bid Date: Jul 10 2025
Victoria, TX
Bid Date: Jul 02 2025
Victoria, TX
Bid Date: Jul 22 2025
Victoria, TX
Bid Date: Jun 05 2025
Victoria, TX
--
Victoria, TX
Bid Date: May 16 2025
Victoria, TX
Bid Date: May 05 2025
Victoria, TX
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
