Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 27, 2025 at 8:00 PM
Updated August 28, 2025
Site work and paving for a sidewalk / parking lot in Portland, Oregon. Design plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The design of two new signalized crossings of 122nd Avenue, one at NE Davis and another at SE Clinton, is complete. This project will soon be bid, and construction of these two crossings is anticipated to begin in the late fall or winter of 2025. Funding for these crossings is through Fixing Our Streets. The design of three other signals on 122nd Avenue (at/near NE Beech St, NE Russell St, NE Broadway St,) is nearing completion and is beginning the right-of-way acquisition process. Portland City Council voted to accept federal grants distributed by Metro through the Regional Flexible Funding Allocation (RFFA) program which includes $6.4 million for this project. Construction of these three crossings is planned for the summer of 2026. Each crossing will include high visibility continental (zebra) crosswalk markings, streetlighting, Americans with Disabilities Act (ADA) compliant curb ramps. Additionally, each crossing will be signalized with a Rectangular Rapid Flashing Beacons (RRFB) and medians, Pedestrian Hybrid Beacons, or half signals. Note: A previously proposed crossing of 122nd Avenue at NE Multnomah Street was cut due to lack of budget, public feedback, and right-of-way complexities. The project is included in the city's 2025-2027 Capital Improvement Program (CIP). As of August 27, 2025, project is in design. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Sidewalks / Parking Lot
$6,400,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 28, 2025
SE 122nd Ave, Portland, OR
Related To This Project
Portland, OR
Bid Date: Sep 25 2025
Portland, OR
Bid Date: Dec 18 2019
Portland, OR
Bid Date: Apr 23 2021
Portland, OR
Bid Date: Nov 17 2020
Portland, OR
Bid Date: Sep 30 2025
Portland, OR
Bid Date: Sep 05 2025
Portland, OR
--
Portland, OR
Bid Date: Sep 10 2025
Portland, OR
--
Portland, OR
--
Portland, OR
Bid Date: Oct 15 2025
Portland, OR
Bid Date: Sep 18 2025
Portland, OR
Bid Date: Aug 28 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
