BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2025 at 8:00 PM

Updated July 2, 2025

Demolition, site work and renovation of a municipal facility in Mountain Brk, Alabama. Completed plans call for the demolition of a municipal facility; for the renovation of a municipal facility; and for site work for a municipal facility.

Prequalification packages and project summary information will be made available on or after Wednesday, May 23, 2025, by contacting Williams Blackstock Architects c/o Derek Needham via e-mail at derek@wba-architects.com. Prequalification packages must be submitted no later than 2:00pm local time on Friday, May 2, 2025 via electronic copy emailed to derek@wba-architects.com. Notification of successful prequalified respondents will be issued no later than 12:00pm local time on Tuesday, May 13, 2025, at which time final bid documents will be made available. The Project work includes, but is not limited to, selective demolition, renovation and alteration/new construction to the existing 2-story, structural steel and metal-framed building with masonry veneer. Partial roof structure replacement, new section of light-gauge roof structure, and complete replacement of existing flat roof assembly will be included, with site demolition and grading for new site amenities, landscape and all related work as indicated on the Bid and Contract Documents. A cashier's check or bid bond payable to the City of Irondale, Alabama, in an amount not less than five percent (5%) of the amount of the total amount bid, but in no event more than $10,000, must accompany the bidder's proposal. The bid Bond shall bear the same date as set for the receipt of Bids. The Bid Bond shall be signed by an agent authorized to do business in the State of Alabama. The contractor whose bid is selected must furnish performance and statutory Labor and Material Payment Bonds and insurance in compliance with bid specification requirements at the signing of the Contract. Completion Time: Work shall commence on the earlier of either the date of the City's written "Notice to Proceed" or the contractor's receipt of the fully executed contract and shall be "Substantially Complete" within 486 Consecutive Calendar Days thereafter. The City reserves the right to reject any or all bid proposals, to waive any formality in any Bid, and to waive technical errors if, in its judgment, the best interests of the City will thereby be promoted.

Post-Bid

Municipal

$900,000.00

Public - City

Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
58
Bidding Soon
643
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2025

July 18, 2025

Project location map

3521 Ratliff Rd, Mountain Brk, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.