BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2025 at 7:00 PM

Updated December 23, 2025

Site work for a civil project in Burns Lake, British Columbia. Completed plans call for site work for a bridge / tunnel; and road / highway.

This contract is with BC Timber Sales in the Kootenay Business area and the project consists of 280m of road realignment, removal and transport of the existing 30m bridge # N5-029, and installation of new 45m bridge # N5-029A. The road construction involves all phases of road construction including timber cut and removal, end haul, drill and blast rock, culvert installation and surfacing. Documents can be obtained from www.bcbid.gov.bc.ca

Award

Bridges / Tunnels

$1,614,500.00

Public - State/Provincial

Site Work

5

14

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
1
Bidding Soon
14
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

July 14, 2025

Project location map

Multiple Locations, Burns Lake, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.