BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2025 at 8:00 PM

Updated June 17, 2025

Site work for a mixed-use development in Brier, Washington. Completed plans call for site work for a parking garage; playground / park / athletic field; and water / sewer project.

The Brier Amphitheater Site Work proposes grading, site preparation, installation of a concrete parking area, installation of a concrete seating area, stormwater infrastructure installation/relocation, and foundation preparation in anticipation of a new structure located at the City Park. The project will also include site cleanup and landscaping. The number of working days for Physical Completion of this project is 30 calendar days. Est. Value Notes: Estimated range of $100,000 to $120,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$159,849.00

Public - City

Site Work

12

9

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
109
Bidding Soon
1,789
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

July 4, 2025

Project location map

2903 228th St SW, Brier, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.